Laserfiche WebLink
Mr Kenneth Earnest <br /> Ultramar,Inc <br /> June 26, 1997 <br /> iPage 2 <br /> materials (i a silts and clay), therefore making SVE remediation less effective The mass balance <br /> calculations are included in Appendix B <br /> Based on the mass balance calculations described above, it is estimated that 8,334 gallons of TPH as <br /> diesel has been removed from the site through SVE remediation and tank excavation activitie, This <br /> equates to a TPH as diesel mass reduction of approximately 65 percent <br /> Limitations and Signa res <br /> The interpretations contained in this document represent our professional opinions, and are based in <br /> part, on information supplied by the client These opinions are based on currently available information <br /> and are arrived at in the accordance with currently accepted hydrogeological and engineering practices <br /> at this time and Iocation Other than this,no warranty is implied or intended <br /> If you have any questions,please contact the undersigned at(916)63 8-2085 <br /> Sincerely, <br /> DELTA ENVIRONMENT L CONSULTANTS,INC. <br /> en W Meeks <br /> Project En the <br /> Owen M Kittredge,RG * 0 NO. � m <br /> Project Manager <br /> N� <br /> SWM(1.RP001915) 9 <br /> Enclosures aF CA <br /> cc Mr Kenneth Earnest,Ultramar,Inc <br /> F <br /> i <br />