Laserfiche WebLink
ESTIMATION OF PETROLEUM HYDROCARBONS <br /> EXISTING IN SOIL PRIOR TO REMEDIATION-Coutinued <br /> Beacon Station No 695 <br /> 900 South Cherokee Lane <br /> Lodi, California <br /> 4 Pounds of benzene (Volume 4) <br /> C ! 005 ppm + 05 ppm + 0 005 ppm <br /> 3 <br /> C = 0 19ppm. <br /> It ((40) (30) - (15) (15)) (10 110 lbs 0.19 ppm <br /> ft3 1 x 106 <br /> = 0 6 lbs <br /> Total pounds of benzene (Layer D) <br /> 17 5 lbs + 14.3 lbs + 0 4 lbs + 0 6 lbs = 32 8 lbs <br /> (E) Layer E (40-49 feet) <br /> 1 Pounds of benzene (Volume 1) <br /> C = 5 0 ppm + 5.0 ppm + 5.0 ppm <br /> 3 <br /> C = 5 0 vnm <br /> = n (57 5) (15) (10) 110 lbs 5 0 ppm <br /> ft3 -1X 106 <br /> 14 9 lbs <br /> MS002 915 <br />