Laserfiche WebLink
TABLE 4-Continued <br /> SOIL SAMPLE ANALYTICAL RESULTS <br /> TANK PIT, PRODUCT LINE, AND PUMP ISLAND SOIL SAMPLES <br /> Concentrations in milligrams per kilogram(mg/kg) <br /> Former Beacon Station No 695 <br /> 900 South Cherokee Lane <br /> Lodi, California <br /> Depth Ethyl- Total TPI'as TPH as <br /> Sample No_ (ft Date Benzene Toluene benzene XXylenesasg ohne diesel Total Lead EDB° <br /> T-4A 14 01/14/94 <0 005 <0 005 <0 005 <0 005 NA 560 NA NA <br /> T-4A-2 18 01/18/94 <0 50 <0 50 <0 50 <0 50 600` 5,500 NA NA <br /> T4B 14 01/14/94 <0 005 0 014 0 010 0 022 NA 110 NA NA <br /> T-4B-2 16 01/18/94 <0 0050 <0 0050 <0 0050 <0 0050 161 2,000 NA NA <br /> T-4C 14 01/14/94 <0 005 <0 005 <0 005 <0 005 NA <10 NA NA <br /> MW-5 20 01/18/94 <0 0050 <0 0050 <0 0050 <0 0050 2 T 790 NA NA <br /> MW-7 30 01/18/94 <0 050 0 085 <0 050 0 084 190` 780 NA NA <br /> MW-2 225 01/19/94 <0 0050 <0 0050 <0 0050 00081 37 7,500 NA NA <br /> TB-1 30 01/19/94 <0 50 12 <0 50 90 550` 1,600 NA NA <br /> Beacon Pump Island and Product Line Trenches <br /> PI-1 3 5 01/14/94 <0 005 <0 005 <0 005 <0 005 <10 NA 14 <100 <br /> PI-2 45 01/14/94 <0 005 <0 005 <0 005 <0 005 <1 0 NA 16 <100 <br /> PI-3 4 5 01/14/94 <0 005 <0 005 <0 005 <0 005 <1 0 NA 13 <100 <br /> PI-4 40 01/14/94 <0 005 <0 005 <0 005 <0 005 <10 NA 25 <100 <br /> PI-5 4 0 01/14/94 <0 005 <0 005 <0 005 <0 005 <10 NA 4 7 <100 <br /> PI-6 40 01/14/94 <0 005 <0 005- <0 005 <0 005 <10 NA 6 4 <100 <br /> PL-1 40 01/14/94 <0 005 <0 005 <0 005 <0 005 <10 NA 29 <100 <br /> PL-2 5 0 01/14/94 <0 005 <0 005 <0 005 <0 005 <10 NA 45 <100 <br /> DPI-1 45 01/14/94 <0 005 <0 005 <0 005 <0 005 640 9,400 NA NA <br /> DPI-2 45 01/14/94 <0 005 <0 005 <0 005 <0 005 720 13,000 80 <100 <br /> i <br /> TABOO 1915 <br />