Laserfiche WebLink
S A NUJ^Ll1lr OU I N Environmental Health Department <br /> COUNTY— <br /> Aboveground <br /> O IUNTY 'n!' <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> MAXIM CRANE WORKS 2373 E Mariposa Rd Stockton May 21 2019 <br /> Qualified Facility-Tier 1 <br /> 405 CFR 112.6(a)(3)(iii) Overfill prevention for containers not provided,not described in Plan,or tested ❑V u R ❑COS <br /> Qualified Facility-Tier II <br /> 501 CFR 112.6(a)(1), Tier II Qualified Facility Plan not certified by the owner or a PE,as required ❑V ❑R ❑COS <br /> 112.6(b) <br /> 502 CFR 112.6(b)(2) Tier II Qualified Facility Plan technical amendment not certified by the owner or a PE o V o R o COS <br /> 503 CFR 112.6(b)(3), Failure to have a PE certify in writing aftemative measures for a Tier II Qualified Facility o V o R o COS <br /> 112.6(b)(4) <br /> 504 CFR 112.6(b)(4)(i) Failure of owner to assure that a PE makes all required attestations in a Tier II Plan ❑V r R COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section c V u R u COS <br /> 602 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection,if applicable o V o R o COS <br /> 603 CFR 112.7(a)(3) Failed to adequately describe the physical layout of the facility in the Plan o V o R o COS <br /> 604 CFR 112.7(a)(3)(i) Plan failed to include oil type and storage rapacity for each container ■V o R o COS <br /> 605 CFR 112.7(a)(3)(ii) Plan failed to adequately discuss discharge prevention measures,including routine handling o V o R o COS <br /> 606 CFR 112.7(a)(3)(iii) Plan failed to adequately discuss facility drainage or drainage controls o V o R o COS <br /> 607 CFR 112.7(a)(3)(iv) Plan failed to include countermeasures for discharge discovery,response and cleanup o V o R o COS <br /> 608 CFR 112.7(a)(3)(v) Plan failed to address disposal methods for recovered materials o V o R o COS <br /> 609 CFR 112.7(a)(3vi), Plan failed to adequately contain procedures for reporting a discharge o V o R o COS <br /> 112.7(a4) <br /> 610 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan o V o R o COS <br /> 611 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence o V o R o COS <br /> 612 CFR 112.7(c) Plan failed to include secondary containment,diversionary structures,or equip to prevent discharge o V o R o COS <br /> 613 CFR 112.7(c) Failure to provide appropriate secondary containment,diversionary structures or equipment o V o R o COS <br /> 614 CFR 112.7(d) PE certified Plan failed to explain impracticability of oontainment/diversionary structures o V o R o COS <br /> 615 CFR 112.7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability o V o R o COS <br /> 616 CFR 112.7(d)(1) Failure to prepare an oil spill contingency plan when claiming impracticability of structures o V o R ❑COS <br /> 617 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge o V o R o COS <br /> 618 CFR 112.7(e),112.8(c) Failed to keep records of procedures,inspections,or integrity tests for three years o V o R o COS <br /> (6) <br /> 619 CFR 112.7(f)(1) Failed to train personnel on all discharge prevention details listed in this section o V a R o COS <br /> 620 CFR 112.7(f)(2) Failed to designate a person accountable for discharge prevention o V o R o COS <br /> 621 CFR 112.7(f)(1) Failure to include in the SPCC Plan an adequate description of employee training o V o R o COS <br /> 622 CFR 112.7(f)(3) Failure to conduct complete annual discharge prevention briefings for oil-handling personnel o V o R o COS <br /> 623 CFR 112.7(g) Plan failed to address security of site and valves,lock out/tag out,and lighting o V o R o COS <br /> 624 CFR 112.7(8) Facility failed to implement security of site and valves,lock out/tag out,and lighting o V o R o COS <br /> 625 CFR 112.7(h) Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack o V o R o COS <br /> FA0009394 PR0523161 SCO01 05/21/2019 <br /> EHD 28-01 Rev.09/27/2018 Page 2 of 8 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />