Laserfiche WebLink
Ruvalcaba, Cesar <br /> From: DPaul <spccorp@hotmaitcom> <br /> Sent: Wednesday, May 22,2019 8:02 AM <br /> To: Ruvalcaba,Cesar, Todd McWhorter <br /> Subject: Re: Periodic Integrity Test Report- San Joaquin County Environmental Heath <br /> Cesar: <br /> We will review the inspection results/procedures with the STI SP001 inspector on our staff at the time and will <br /> respond as promptly as possible. We understand each of the itemized issues you have asked for clarification <br /> and will address each in the sequence you presented. We appreciate the opportunity to coordinate this data <br /> as well as the procedures (yes, we are currently applying the 6th edition of the Standard) with your <br /> jurisdiction. Thank you. <br /> D. Paul McWhorter, CEO <br /> SPC Corporation <br /> From: Ruvalcaba,Cesar<cruvalcaba@sjgov.org> <br /> Sent: Wednesday, May 22,2019 7:54 AM <br /> To:SPCCorp@hotmaiLcom <br /> Cc: MBermudez@maximcmne.com <br /> Subject: Periodic Integrity Test Report-San Joaquin County Environmental Heath <br /> Hi Paul, <br /> As gathered from telephone conversations with you,the Periodic Integrity Test Certificates are the equivalent to the <br /> SPCC SP-001 certified inspection reports. <br /> The attached report was from an APSA/SPCC inspection conducted at Maxim Crane Works in Stockton,CA. on <br /> 10/08/2012. The attached inspection report would not qualify as a certified inspection report because it does not seem <br /> to have the certified SP-001 inspector information as required by the standard and is missing some other required <br /> statements or assessments. If a more recent inspection report exists,please provide the report along with any <br /> checklists. <br /> The requirements per section 7 of the 6' edition of the STI SP-001 standard,this is the same as the 4th edition,which is <br /> referenced in the certificate. <br /> 7.10 In the final report,include field data,measurements,pictures,drawings,tables,and an inspection summary. In the <br /> summary,identify unacceptable conditions and recommended and/or mandatory corrective actions. Determine the <br /> suitability for continued service of the AST per Section 10.0 and document this in the final report. Include the date of the <br /> next scheduled FEI or FII,as applicable. Include the inspector's name and certification number in the report. <br /> Is there a detailed checklist of the inspection that can be provided as well?As per section 7 of the 6th edition of the STI <br /> SP-001 standard,this is the same the 4th edition. <br /> 7.1.2 The following paragraphs describe minimum inspection guidelines.There are numerous AST configurations and <br /> components and it is the responsibility of the Certified Inspector to identify and properly inspect them to conform to the <br /> owner's requirements,industry standards and regulatory requirements,as applicable.The inspector or the inspection <br /> company shall develop detailed checklists that identify,record,and document all aspects of each inspection. <br /> 1 <br />