My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2373
>
2800 - Aboveground Petroleum Storage Program
>
PR0523161
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:41:36 AM
Creation date
5/22/2019 9:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523161
PE
2832
FACILITY_ID
FA0009394
FACILITY_NAME
MAXIM CRANE WORKS
STREET_NUMBER
2373
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
2373 E Mariposa Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a)technically,the tank is supposed to be tested prior to shipping via DOT requirements (however, we maybe <br /> able to put a sufficient load of dry-ice in the primary vessel and ship it to Stockton, CA for the test)--; <br /> b) Donlee Pump is cl in order to provide you a bid on removing the existing 12K tank and the <br /> installation/plumbing of the new tank(how big is the Pleasant Grove tank?single wall vs doublewall?brand of <br /> tank?)---also, using STI SP001 test-criteria/format,the new tank will need to be anchored within the berm as <br /> you are located in a seismic zone. <br /> c) upon delivery, SPC Corp can conduct the integrity test......I will provide a quote but a ballpark estimate <br /> would be$750 to conduct the 5-year periodic integrity test----the reason the codes require the 2nd test is due <br /> to the prospect of any damage incurred in the shipping from Pleasant Grove, CA to Stockton, CA <br /> d) our availability to conduct the test would have to be 7/22-7/26 as we are in Los Angeles,CA all next week <br /> for inspections/testing. <br /> Cesar Ruvalcaba, San Joaquin CUPA inspector is cl because I debriefed him regarding our onsite inspection <br /> yesterday at your facility. The best insurance for us to get these compliance issues resolved is to keep Mr. <br /> Ruvalcaba informed as we undertake our corrective-action plan. Thanks. <br /> Paul <br /> SPC Corp <br /> CONRDENTIALITY NOTICE <br /> This a-mail,and the Information transmitted,along with any attachments,contains Information that Is,or may be,covered by electronic communication privacy <br /> laws,and Is also confidential,proprietary legally privileged anclor othervAse exempt from disclosure.This a-mail,and the Information transmitted,along with any <br /> attachments,Is Intended only for the person or entity to which it Is addressed.If you are net the Intended recipient,piease he advised that any reviev,re- <br /> transmission,dissemination,copying,or any other use of,or taking of any action In reliance upon,this Information is strictly prohibited.If you receive this a-mail In <br /> error,please comact the sender Immediately by telephone(012-500-0200)or by return a-mail,and Immediately delete the material and any and all attachments <br /> thereto.Thank you In advance for your cooperation. <br /> hffoY/ wmaximcrdnecam <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.