Laserfiche WebLink
Boring: B4 ' <br /> y u c him Page 1 of 1 <br /> 1 <br /> Project Name : J &D Trust Project Number: Zions-2140-CA <br /> Date: 7/19/2012 Project Location 1011 South Cherokee Lane, Lodi,CA ' <br /> Drilling Contractor: Cascade Drilling Drilling Method: Geoprobe <br /> Logged By: Buffie Chournos ' <br /> Notes: Adjacent to in-ground lifts in the southwestern portion of the building <br /> o <br /> Y a j a U V <br /> v E o E E Visual Classification <br /> 0 Concrete and fill <br /> — <br /> 24/ ML Sandy-silty mix, no odor-no stain <br /> 48 <br /> 1 <br /> 36/ B4- ML/ Sandy-silty mix,fine grain <br /> 48 S1 SM 5'-6'slight petroleum like odor,dark colored soil ' <br /> Took B4-Sl between 5'-7' <br /> 8 <br /> t; 1 <br /> i <br /> 48/ w ,,. ; Sandysiltymix,fine grain <br /> 48 x No odor-no stain <br /> —; m - t <br /> 12 <br /> B4- i <br /> Sandy-silty mix,fine grain <br /> 36/ 5 SM <br /> S2 r ? No odor-no stain ' <br /> 36 <br /> 15 r Took 134-52 between 12'-14' <br /> X:a is <br /> Clayey-sand mix, No odor- no stain ' <br /> r f.Ft SC End hole at 15' <br /> 20 <br /> 1 <br /> 25 1 <br /> 1 <br /> 1 <br />