My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
2800 - Aboveground Petroleum Storage Program
>
PR0515766
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2019 8:48:47 AM
Creation date
5/24/2019 1:55:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515766
PE
2832
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
01
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: 1604 SOUTH B ST. - STOCKTON Record ID#PRO515766 <br /> Dale of Inspection:05/23/2019 Program:2832- APSA <br /> PHOTO 4: Second enerator had this slicker on it. Generator me be double walled based on point 5. Facility to investigate. <br /> 0 WARM ING <br /> • This generator base tank has been pressure tested at 3 to 5 psi for weld integnty. <br /> HOWEVER, it has not been designed as a pressure vessel and must be vented from <br /> �supptied openings. <br /> •Ttiis-tank was designed, manufactured, and intended for DIESEL FUEL ONLY. <br /> • This tank is intended for stationary installation only. <br /> • Maximum load capacity 4,000 lbs. I <br /> + Pressurize primary tank when pressure testing annular space. <br /> •Maximum leakage test pressure of 3 psi. <br /> • When tank is being filled via pump: <br /> The overflow fitting of this atmospheric day tank must be plumbed in a continuous <br /> downward path toward main tank without downsizing to prevent a potential DIESEL <br /> FUEL SPILL. <br /> -ffa continuous downward pall, is ilrpossible, consult installation guide or factory for <br /> additional overflow safety requirements. <br /> •To prevent fuel & component contamination, it is highly recommended use a 100 mesh <br /> fuel strainer on the incoming fuel line. <br /> NOTE:See installation & operation manual for proper electrical Installation requirements <br /> and additional safety considerations. <br /> sorao4i <br /> Staff Person Name, Cesar Ruvalcaba Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.