My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
2800 - Aboveground Petroleum Storage Program
>
PR0515766
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2019 8:48:47 AM
Creation date
5/24/2019 1:55:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515766
PE
2832
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
01
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ Q A Q U I N Environmental Health Department <br /> COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facilim Address: Oma: <br /> Caltrans-Stockton 1604 S B St. Stockton May 23 2019 <br /> Qualified Facility-Tier I <br /> 405 CFR 112.6(a)(3)(iii) Overfill prevention for containers not provided,not described In Plan,or tested o V o R o COS <br /> Qualified Facility-Tier 11 <br /> 501 CFR 112.6(a)(1), Tler II Qualified Facility Plan not certifietl by the owner or a PE,as required o V o R o COS <br /> 112.6(b) <br /> 502 CFR 112.61 Tier 11 Qualified Facility Plan tech nical amendment not certifietl by the owner or a PE oV q oCOS <br /> 503 CFR 112.6(bX3), Failure to have a PE certify In writing alternative measures for a Tier 11 Qualified Facility o q oCOS <br /> 1126(b)(4) <br /> 504 CFR 112.6(b)(4)(I) Failure of owner to assure that a PE makes all required attestations In a Tier 11 Plan .V .R .COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 1121 Failure of Plan tofulfill basic requirements including a prodiereffierending section .V .R .COS <br /> 602 CFR 112.711 Ran failed to discuss equivalent environmental protection,if applicable o o oCOS <br /> 603 CFR 112](1X3) Fell to adequately describeth a ph ysi cal layout of the facility In the Pl an c c oCOS <br /> 600 CFR 112.7(.1 Ran failed to include oil type and storage capacity for eada container c c oCOS <br /> E05 CFR 112.7ni ii) Ran failed to adequately discuss discharge prevention measures,including roulne hsrMkg q c oCOS <br /> 606 CFR 112.7(aX3Xiii) Ran failed to adequately discuss facility drainage or drainage controls q c cCOS <br /> 607 CFR 112.7ni iv) Ran failed to include countermeasures for discharge discovery,response and cleanup c c cCOS <br /> 608 CFR 112.7(aX3Xv) Ran failed to ackrea disposed methods for recovered materials c c cCOS <br /> 609 CFR 112.7ni 1, Ran failed to adequately contain procedures fm reporting a discharge c c cCOS <br /> 112.](.4) <br /> 610 CFR 112](.X5) Discharge procedures are not adequately addressed lfthe facility has rw response plan c c cCOS <br /> 611 CFR 112.7(b) Ran failed to include a description of potential equipment failure or provide equivalence c c cCOS <br /> 612 CFR 112.7(c) Ran failed to include secondary containment,diversionary structures,or equip to prevent discharge c c cCOS <br /> 613 CFR 112.7(c) Failure to provide appropriate secondary containment,diversionary structures or equipment c c cCOS <br /> 610 CFR 112](4) PE cafified Ran failed to explain Impracticability of contain menVtllversion ary structures c c cCOS <br /> 615 CFR 112](4) Failure to perform Integrity and leak testing when claiming secondary containment impracticability c c cCOS <br /> 616 CFR 112.7(dX1) Failure to prepare an oil spill contingency plan when claiming Impracticability of structures c c cCOS <br /> 617 CFR 112.7(dX2) No waieon commitment of manpower,equipment,and materials to control and remove oil discharge c c cCOS <br /> 618 CFR 112.7(e1,112.8(c) Faredto keep records of procetlures,Inspections,or Integrity testsformaeeyears .V .R cCOS <br /> (6) <br /> 619 CFR 112.7(fX1) Fared to"in personnel on all discharge prevention details listed al section c c cCOS <br /> 620 CFR 112.7(fX2) Falledto designate a person accountablefor discharge prevention c c cCOS <br /> 621 CFR 112.7(fX1) Faiureto include In the SPCC Plan an adequate description of employeetraning c V c R c COS <br /> 622 CFR 112.7(fX3) Faiureto conduct complete annual dischargeprevention briefngsfor oil-handling personnel c c cCOS <br /> 623 CFR 112.7(g) Penel to address security ofmiteandvelves,lack oumag out,and lighting c c cCOS <br /> 620 CFR 112.7(g) Facility failed to implement security ofske allied vall lock oumag out,and lighting c c cCOS <br /> 625 CFR 112.7(h) Ran fared to adequately Nsaas facility tank car and tank tarck lond'ng/nlondkg rack, o V c R c COS <br /> FMi0i P110515706 SCOW 05232019 <br /> EH018U111-09l9/A1S Page 2of6 Abaveg J Ptlrtlam Storage AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 w.vw.sjoehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.