My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCUST
>
805
>
2800 - Aboveground Petroleum Storage Program
>
PR0516480
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2019 4:22:10 PM
Creation date
5/24/2019 4:02:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516480
PE
2832
FACILITY_ID
FA0010466
FACILITY_NAME
CALIFORNIA FREIGHT
STREET_NUMBER
805
Direction
S
STREET_NAME
LOCUST
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25935010
CURRENT_STATUS
01
SITE_LOCATION
805 S LOCUST AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for CALIFORNIA FREIGHT as of August 26, 2019. <br /> Open violations from July 24, 2018 inspection <br /> Violation#102-Failed to prepare a written SPCC Plan in accordance with CFR Part 112. <br /> This facility has an Aboveground Petroleum Storage Act(APSA) regulated shell capacity of over 10,000 gallons. A <br /> Spill Prevention, Control, and Countermeasure(SPCC) Plan was not available on site. All facilities which have an <br /> APSA regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets all of the <br /> requirements of the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance with 40 <br /> CFR 112.3(d). Immediately prepare a SPCC Plan in accordance with 40 CFR Part 112,which that includes all <br /> aboveground petroleum storage containers 55 gallons or larger. Submit a copy of the Professional Engineer(PE) <br /> certified SPCC Plan to the EHD for review. (This copy will be returned to the facility after review.) A copy shall be <br /> maintained on site at all times. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.