Laserfiche WebLink
implement this Plan. I also understand my other obligations relating to the <br /> storage of oil at this facility, including, among others; <br /> a. To report a discharge to navigable waters or adjoining shorelines to the <br /> appropriate authorities. Notification information is included in the Plan; <br /> b. To review and amend this Plan whenever there is a material charge at the <br /> facility that affects the potential for an oil discharge, and at least once <br /> every five years. Reviews and amendments are recorded in an attached <br /> log [see Five Year Review Log and Technical Amendment Log in <br /> Attachments 1.1 and 1.2]; (40 CFR 112.5(a)) <br /> I certify that I have satisfied the requirements to prepare and implement a Plan under <br /> §112.3 and all of the requirements under §112.6(b). I certify that the information <br /> contained in this Plan is true. <br /> Signature Date <br /> Name: Richard Williams Title: General Manager <br /> II. Records of Plan Review <br /> a. Professional Engineering Review and Certification (§112.6(b)(4) <br /> QPOF@SSjp <br /> e?N <br /> L o� � S <br /> C�3/5856 <br /> J; n• ngirrer &A <br /> OFtCAL <br /> Dr, C,Hugh Thompson, PE#085858 <br /> I am familiar with and have visited the Tower Park Marina and observed the oil <br /> handling and storage facilities. I have reviewed this SPCC Plan and find it meets <br /> the requirements of 40CFRI12 using good engineering practices and meeting <br /> applicable industry standards. <br /> Tower Park Marina, SPCC page 3 of 25 <br />