My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COMCONEX
>
17333
>
2800 - Aboveground Petroleum Storage Program
>
PR0518597
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 1:51:07 PM
Creation date
5/24/2019 4:35:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0518597
PE
2832
FACILITY_ID
FA0011214
FACILITY_NAME
ATS MANTECA
STREET_NUMBER
17333
Direction
S
STREET_NAME
COMCONEX
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20818018
CURRENT_STATUS
01
SITE_LOCATION
17333 S COMCONEX RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
American having Systems, Inc. <br /> American Paving Systems,Inc. in Manteca, CA is a professional Road Repair and Paving <br /> service operation working under SIC Code 1611 and pursuant to 40 CFR 112 hereby establishes a <br /> Certified Spill Prevention Control & Countermeasure Plan (hereafter referred to as SPCC Plan) <br /> which will be maintained at the working site_The management of American Paving Systems,Inc., <br /> Manteca, CA acknowledges its responsibilities to its neighbors,employees, and the community to <br /> take all reasonable actions and measures necessary to prevent spills from the facility in order to <br /> protect human health and the environment. If, despite American Paving Systems, Ine.'s efforts, a <br /> spill does occur, trained agents and employees of American Paving Systems, Inc. will take all <br /> necessary steps as defined within the SPCC Plan to minimize the impact of such a spill. <br /> The SPCC Plan is a working document designed to be sustainable and used as a tool by <br /> American Paving Systems, Inc. to prevent or minimize oil product spills. As such, American <br /> Paving Systems,Inc.will see that its agents and employees are properly informed of the provisions <br /> of the SPCC Plan, are properly trained and know their role in maintaining the SPCC Plan or on <br /> minimizing a spill that occurs. American Paving Systems, Inc. is committed to providing the <br /> necessary resources to establish and maintain the Spill Prevention Control&Countermeasures set <br /> forth herein. The SPCC Plan will be reviewed at minimum every five years, from implementation, <br /> or sooner if facility changes impact the SPCC Plan requirements. Any engineering certification <br /> required for facility operating changes will be added to Appendix K. The SPCC Plan will replace <br /> all previous versions and establishes an efficient method for maintaining compliance with 40 CFR <br /> 112 requirements. <br /> (Tank is a Certified UL 142 Single Wall tank) <br />
The URL can be used to link to this page
Your browser does not support the video tag.