Laserfiche WebLink
American Paving Systems, Inc. <br /> SPCC Pian Review 40 CFR 112.5(a)(b) <br /> American Paving Systems, Inc. will complete a review and evaluation of the application <br /> of their SPCC plan and the facility operations at least once every five years from the date of <br /> implementation or upon any significant change or modification to the operations. As a result of <br /> the review or evaluation modifications to the SPCC Plan, American Paving Systems, Inc. will <br /> make the necessary amendments within six months of the findings. If new and field proven <br /> technology has been developed and is found to be suitable for the facility operation at the time of <br /> review and the new technology is a more effective prevention and control that can significantly <br /> reduce the likelihood of a discharge as described in §112.1(b) from the facility. American Paving <br /> Systems, Inc. will implement any amendment as soon as possible, but no later than six month <br /> following preparation and adoption of any amendment. American Paving Systems, Inc. will <br /> document their completion of the review and evaluation, and will sign a statement as to whether <br /> the SPCC Plan will or will not be amended, in Appendix K of the SPCC Plan. <br /> Management Approval <br /> Full approval is extended by the management of American Paving Systems, Inc. at a level <br /> of authority to commit the necessary resources to implement this SPCC Plan. <br /> �-- ?,x <br /> Ope ions.or <br /> Managemea Signature Date <br /> Print Name of resp.nsible party <br /> '' 6 <br />