My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COMCONEX
>
17333
>
2800 - Aboveground Petroleum Storage Program
>
PR0518597
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 1:51:07 PM
Creation date
5/24/2019 4:35:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0518597
PE
2832
FACILITY_ID
FA0011214
FACILITY_NAME
ATS MANTECA
STREET_NUMBER
17333
Direction
S
STREET_NAME
COMCONEX
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20818018
CURRENT_STATUS
01
SITE_LOCATION
17333 S COMCONEX RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
American Paving Systems, Inc. - Manteca, CA <br /> -- Tank, Piping & Secondary Containment <br /> [:A::ppendix B & C Inspection Checklists 2020 <br /> Tank, Piping & Foundation <br /> Inspection ����`�.,�'�Q g�� c�'� a'�mQ o0 200 �°$ <br /> Check fuel oil product tanks,piping and foundation <br /> for leaks:(as appropriate) <br /> Product droplets or drip marks Checklist Instructions: <br /> Place an "X" in the box associated with <br /> Discolorization of tanks,piping&filter the observed defect as appropriate for the <br /> Puddles containing oil products or sheen facility.if no defects are observed,place a <br /> Corrosion d mark in each of the boxes for the month. <br /> If defects are observed and marked, a <br /> Localized dead or damage vegatation plan for corrective action must be <br /> Vent caps are in place prepared and implemented.on page 2 of <br /> Tank supports Appendix B & C or additional sheets as <br /> Cracks or fissures needed. <br /> Settling Note: <br /> Gaps between tank&foundation All inspections must be performed on a <br /> Corrosion monthly basis.The responsible person for <br /> Evidence of seeping values or seals performing the inspection shall initial and <br /> date each month that they inspected the <br /> Emergency control valves facility. Again it is imperative that the <br /> 1�5 <br /> a Inspection person doing the inspection make note of <br /> rea for oil and solid waste spills any discrepancies in any of the <br /> abovementioned items and report them <br /> ive level of precipitation[ immediately to the proper facility <br /> personnel. Similar requirements exist in <br /> Corrosion 40 GFR I I2.7(e). <br /> Leaks <br /> Oil product stains or spills <br /> Hazardous waste drums labled<180 days <br /> No unsecured hazadous waste <br /> Waste removal and manifests on site I Special Instructions: <br /> Other Inspection OilfWeter Separators: <br /> Inspect monthly each iteam and check <br /> Inspection performed by: the appropriate box. <br /> Please sign and date legibly If oil product present, then have <br /> Eremoved as Hazardous Waste under <br /> manifest by a CA Registered <br /> Transporter. If Oil Sheen present, use <br /> absorbent pads to remove sheen then <br /> Comments: drain clean water into Drainage System. <br /> Place used pads in labeled Hazardous <br /> Waste Container. Report any spills. <br /> Note: Document any action taken in <br /> Appendix D - Secondary Drainage <br /> Report. <br /> 'z <br /> 4 Gary Reeves,LLC 34 <br /> .... <br />
The URL can be used to link to this page
Your browser does not support the video tag.