My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1645
>
3500 - Local Oversight Program
>
PR0544495
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 10:56:54 AM
Creation date
5/28/2019 10:43:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544495
PE
3528
FACILITY_ID
FA0003688
FACILITY_NAME
INDUSTRIAL RAILWAYS COMPANY - STOCKTON YARD
STREET_NUMBER
1645
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11910013
CURRENT_STATUS
02
SITE_LOCATION
1645 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Soil and Groundw`'rTer Investigation Work Plan <br /> CCT Stockton Rail Yard, 1645 Cherokee Lane, Stockton,CA <br /> October 4, 2007 <br /> Page 7 <br /> 7.o REFERENCES <br /> CLS Environmental Services, Inc., 2006. Remedial Action Report, Central California Traction <br /> Company, 1645 Cherokee Rd., Stockton, CA. December 12. <br /> Hydro Environmental Technologies, Inc. (HETI), 2001. Phase II Environmental Site Assessment, <br /> Central California Traction Company, 1645 Cherokee Lane, Stockton, California. March 29. <br /> HETI, 2004. Phase II Contaminant Delineation Investigation, Central California Traction Company, <br /> 1645 Cherokee Lane, Stockton, California. September 30. <br /> URS Greiner Woodward Clyde, 1999• UST Investigation, 1645 Cherokee Lane, Stockton, California. <br /> September 24. <br /> If you have any questions regarding this work plan, please call Keith Woodburne at(925) 688-2488. <br /> Sincerely, <br /> x <br /> (far� r A Q <br /> Rachelle Dunn Keith Woodburne, P.G. <br /> Senior Staff Geologist g� Senior Project Manager <br /> ATTACHMENTS: <br /> CALIF <br /> Figure 1: Vicinity Map <br /> Figure 2: Site Plan <br /> Figure 3: Site Plan Showing Historical Soil and Groundwater Sample Locations <br /> Figure 4: Site Plan Showing Extent of Excavation and Confirmation Soil Sample Locations <br /> Figure 5: Proposed Boring Locations <br /> Table 1: Historical Groundwater Data <br /> Table 2: Analytical Results of Confirmation Soil Sampling (Sample Location Subsequently <br /> Excavated) <br /> Table 3: Analytical Results of Confirmation Soil Sampling (Sample Locations In Place After <br /> Excavation) <br /> Appendix A: Historical Data <br /> cc: Dave Buccolo, CCT <br /> Matt Graham, BNSF <br />
The URL can be used to link to this page
Your browser does not support the video tag.