Laserfiche WebLink
MW-1 <br /> B-1 <br /> B-1 <br /> 94,000 <br /> METAL SHED B-2 13-7 12,000 <br /> - 28 <br /> D-10 <br /> -8 <br /> MW-4� 8 8 <br /> • 2 <br /> B-1 ,900NA <br /> / 8-11 13-9 NA_ <br /> MW-2 <br /> 13-4 •B-5 1,300 13-4 <br /> N5 • <br /> N5 <br /> •B-3 <br /> Q <br /> W3 <br /> LEGEND J <br /> • Woodward Clyde 0oil Boring <br /> HETI Soil Boring <br /> I <br /> {} Groundwater Monitoring Well <br /> i <br /> i <br /> Railroad Tracks <br /> TPH Nomenclature <br /> Project Site: Central California Traction Company FIGURE: 5 <br /> 1645 Cherokee Lane,Stockton,CA <br /> BESProject Number. Date: �Ite ('Ian <br /> CCTC05-001 May 16,2005 w/spike Diesel <br /> BOHM ENVIRONMENTAL SOLUTIONS Drawn By: Concentratlon5 In NOt 1H <br /> DC5 1-inch=20 feet Groundwater <br />