Laserfiche WebLink
HYD -3 <br /> ,#.,er Square[Drive Suite 2 � F <br /> ENV1R NMEHTA L Alamo a 21 26 4 9x501 <br /> Tel 510 521 2684 <br /> TK11N WGIESD 1NCo Fax 510 521 507571V <br /> 1-500-347-HFT] ' T s WE <br /> t�q ! lrlI <br /> Massachusetts <br /> New York lJ <br /> 16 <br /> Maryland JUL PN 12 <br /> New Jersty <br /> July 12, 2001 <br /> Mr P E Copple <br /> Superintendent <br /> Central California Traction Company <br /> 2201 West Washington Street#12 <br /> Stockton, CA 95203-2942 <br /> RE: Additional Ground Water Monitoring Well Installation Work Plan, 1645 Cherokee Lane, <br /> Stockton, CA <br /> Dear Mr Copple <br /> Hydra-Environmental Technologies, Inc 's (HETI's) reviewed the June 8, 2001 letter from the San <br /> Joaquin County Public Health Service (SJCPHS) The following proposal is for the installation of one <br /> additional ground water monitoring well based on the information provided to HETI This work plan <br /> addresses the requirements of the June 8, 2001 letter from the SJCPHS <br /> SITE HISTORY REVIEW <br /> ® Site Location and]Background <br /> The subject property is in Stockton, California north of the intersection of Cherokee Lane and Waterloo <br /> Road The property is approximately 21 feet above mean sea level (AMSL) The subject property is in <br /> an area of mixed light-industnal and commercial buildings, it is part of a property used to repair railroad <br /> engines by the Central California Traction Company <br /> PROPOSED ADDITIONAL GROUND WATER MONITORING WELL INSTALLATION <br /> Project Objectives <br /> Based on the requirement of the SJCPHS, HETI proposes to install one additional ground water <br /> monitoring well northwest from the URS Greiner Woodward Clyde boring B-1 <br /> Task 1 Ground Water Well Installation <br /> Prior to any subsurface investigations, HETI will prepare an updated work plan and a health and safety <br /> (H&S) plan and obtain the required SJCPHS permits The H&S plan will be prepared in accordance with <br /> U S Environmental Protection Agency (USEPA) 29CFR1910 120 and California GISO 5192 All on-site <br /> HETI and subcontractor personnel will be required to adhere to the H&S plan and to have had 29 <br /> CFR1910120 training and its annual update The HETI project manager will have had the <br /> 29CFR1910 120 and California GISO 5192 eight-hour supervisors' course <br />