My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BEYER
>
2904
>
2800 - Aboveground Petroleum Storage Program
>
PR0523480
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 11:06:55 AM
Creation date
5/28/2019 11:05:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523480
PE
2832
FACILITY_ID
FA0009388
FACILITY_NAME
A A & BOB ALLEN INC
STREET_NUMBER
2904
STREET_NAME
BEYER
STREET_TYPE
LN
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
2904 BEYER LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental equivalence-Conditionally allow deviations from specific sections and requirements with <br /> equivalent/alternative means [112.7(a)(2)] <br /> Facility description and diagram [112.7(a)(3)] <br /> Type of oil and storage capacity of each container[112.7(a)(3)(i)] <br /> Discharge prevention measures including procedures for routine handling of oil [112.7(a)(3)(ii)] <br /> Discharge/drainage controls including secondary containment and discharge control procedures <br /> [112.7(a)(3)(iii)] <br /> Countermeasures for discharge discover,response,and cleanup [112.7(a)(3)(vi)] <br /> Disposal methods for recovered materials[112.7(a)(3)(v)] <br /> Emergency response/notification contact list and phone numbers[112.7(a)(3)(vi)] <br /> Information and procedures for discharge reporting[112.7(a)(4)] <br /> Organization of discharge procedures in SPCC Plan so readily useable in an emergency [112.7(a)(5)] <br /> Spill predictions and associated equipment failure descriptions(discharge direction,rate of flow,quantity of oil, <br /> etc.)[112.7(b)] <br /> Requirements and standards for containment and/or diversionary structures;general containment for most <br /> likely release/discharge;examples of containment/diversionary structures[112.7(c)] <br /> Impracticability determination-Explanation and alternate requirements for secondary containment[112.7(d)] <br /> Inspections/tests procedures and records requirements[112.7(e)] <br /> Personnel training and discharge prevention briefings [112.7(f)] <br /> Facility security[112.7(g)] <br /> Facility tank car and tank truck loading/unloading rack requirements[112.7(h)] <br /> Brittle fracture evaluation after repair,alteration,reconstruction,or change in service for field-erected tanks <br /> [112.7(i)] <br /> Discussion requirements for conformance to applicable requirements and other more stringent federal,state, <br /> or local requirements [112.70)] <br /> Conditional alternative requirements for general secondary containment for qualified oil-filled operational <br /> equipment[112.7(k)] <br /> Section 112.8-SPCC Plan requirements for onshore facilities(Applicable sections) <br /> Requirement to meet the 112.7 general requirements and the 112.8 specific discharge prevention and <br /> containment requirements[112.8(a)] <br /> Facility drainage restrictions,required procedures,and methods[112.8(b)(1)-(5)] <br /> Bulk storage container compatibility with stored materials and conditions [112.8(c)(1)] <br /> Requirements and standards for sized secondary containment for bulk storage containers and tanks(100910 <br /> capacity plus precipitation freeboard)[112.8(c)(2)] <br /> Requirements for and limitations on drainage of uncontaminated rainwater from diked areas [112.8(c)(3)] <br /> Corrosion protection requirements for buried or partially buried/bunkered metallic storage tanks <br /> [112.8(c)(4)&(5)] <br /> Specific requirements and examples of regular or periodic integrity testing or inspection of each tank or <br /> container; determination of methods and qualifications in accordance with industry standards;test/inspection <br /> recordkeeping,including comparison records[112.8(c)(6)] <br /> Controlling leaks from/through internal heating coils[112.8(c)(7)] <br /> Engineer/update container installation in accordance with good engineering practice;specific allowable and <br /> required methods for overfill prevention and testing of liquid level sensing devices 112.8(c)(8)] <br /> Effluent treatment facility observation requirement[112.8(c)(9)] <br /> Prompt correction of visible discharges from containers and components;removal of accumulations of oil in <br /> diked areas[112.8(c)(10)] <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.