Laserfiche WebLink
Environmental equivalence-Conditionally allow deviations from specific sections and requirements with <br /> equivalent/alternative means [112.7(a)(2)] <br /> Facility description and diagram [112.7(a)(3)] <br /> Type of oil and storage capacity of each container[112.7(a)(3)(i)] <br /> Discharge prevention measures including procedures for routine handling of oil [112.7(a)(3)(ii)] <br /> Discharge/drainage controls including secondary containment and discharge control procedures <br /> [112.7(a)(3)(iii)] <br /> Countermeasures for discharge discover,response,and cleanup [112.7(a)(3)(vi)] <br /> Disposal methods for recovered materials[112.7(a)(3)(v)] <br /> Emergency response/notification contact list and phone numbers[112.7(a)(3)(vi)] <br /> Information and procedures for discharge reporting[112.7(a)(4)] <br /> Organization of discharge procedures in SPCC Plan so readily useable in an emergency [112.7(a)(5)] <br /> Spill predictions and associated equipment failure descriptions(discharge direction,rate of flow,quantity of oil, <br /> etc.)[112.7(b)] <br /> Requirements and standards for containment and/or diversionary structures;general containment for most <br /> likely release/discharge;examples of containment/diversionary structures[112.7(c)] <br /> Impracticability determination-Explanation and alternate requirements for secondary containment[112.7(d)] <br /> Inspections/tests procedures and records requirements[112.7(e)] <br /> Personnel training and discharge prevention briefings [112.7(f)] <br /> Facility security[112.7(g)] <br /> Facility tank car and tank truck loading/unloading rack requirements[112.7(h)] <br /> Brittle fracture evaluation after repair,alteration,reconstruction,or change in service for field-erected tanks <br /> [112.7(i)] <br /> Discussion requirements for conformance to applicable requirements and other more stringent federal,state, <br /> or local requirements [112.70)] <br /> Conditional alternative requirements for general secondary containment for qualified oil-filled operational <br /> equipment[112.7(k)] <br /> Section 112.8-SPCC Plan requirements for onshore facilities(Applicable sections) <br /> Requirement to meet the 112.7 general requirements and the 112.8 specific discharge prevention and <br /> containment requirements[112.8(a)] <br /> Facility drainage restrictions,required procedures,and methods[112.8(b)(1)-(5)] <br /> Bulk storage container compatibility with stored materials and conditions [112.8(c)(1)] <br /> Requirements and standards for sized secondary containment for bulk storage containers and tanks(100910 <br /> capacity plus precipitation freeboard)[112.8(c)(2)] <br /> Requirements for and limitations on drainage of uncontaminated rainwater from diked areas [112.8(c)(3)] <br /> Corrosion protection requirements for buried or partially buried/bunkered metallic storage tanks <br /> [112.8(c)(4)&(5)] <br /> Specific requirements and examples of regular or periodic integrity testing or inspection of each tank or <br /> container; determination of methods and qualifications in accordance with industry standards;test/inspection <br /> recordkeeping,including comparison records[112.8(c)(6)] <br /> Controlling leaks from/through internal heating coils[112.8(c)(7)] <br /> Engineer/update container installation in accordance with good engineering practice;specific allowable and <br /> required methods for overfill prevention and testing of liquid level sensing devices 112.8(c)(8)] <br /> Effluent treatment facility observation requirement[112.8(c)(9)] <br /> Prompt correction of visible discharges from containers and components;removal of accumulations of oil in <br /> diked areas[112.8(c)(10)] <br /> 4 <br />