My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
23987
>
2800 - Aboveground Petroleum Storage Program
>
PR0526951
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:55:58 PM
Creation date
5/28/2019 11:34:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526951
PE
2832
FACILITY_ID
FA0011210
FACILITY_NAME
LODI AIRPORT
STREET_NUMBER
23987
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00517007
CURRENT_STATUS
01
SITE_LOCATION
23987 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LLodi Airport Management Spill Prevention, Control, and Countermeasure (SPCC) Plan <br /> Corporation <br /> Part 1 : Plan Administration <br /> 1.1 Management Approval and Designated Person (40 CFR 112.7) <br /> Lodi Airport Management Corporation is committed to preventing discharges of oil to navigable <br /> waters and the environment, and to maintaining the highest standards for spill prevention <br /> control and countermeasures through the implementation and regular review and amendment to <br /> the Plan. This SPCC Plan has the full approval of Lodi Airport Management Corporation <br /> management. Lodi Airport Management Corporation has committed the necessary resources to <br /> implement the measures described in this Plan. <br /> The Facility Manager is the Designated Person Accountable for Oil Spill Prevention at the <br /> facility and has the authority to commit the necessary resources to implement this Plan. <br /> Facility Manager (facility response coordinator): Robert Kupka <br /> Signature: <br /> Title: President <br /> Date: May 5, 2018 <br /> 1.2 Professional Engineer Certification (40 CFR 112.3(d)) <br /> The undersigned Registered Professional Engineer is familiarwith the requirements of Part 112 <br /> of Title 40 of the Code of Federal Regulations (40 CFR part 112) and has visited and examined <br /> the facility, or has supervised examination of the facility by appropriately qualified personnel. <br /> The undersigned Registered Professional Engineer attests that this Spill Prevention, Control, <br /> and Countermeasure Plan has been prepared in accordance with good engineering practice, <br /> including consideration of applicable industry standards and the requirements of 40 CFR part <br /> 112. that procedures for required inspections and testing have been established. and that this <br /> Plan is adequate for the facility. <br /> This certification in no way relieves the owner or operator of the facility of his/her duty to prepare <br /> and fully implement this SPCC Plan in accordance with the requirements of 40 CFR part 112. <br /> This Plan is valid only to the extent that the facility owner or operator maintains, tests, and <br /> inspects equipment, containment, and other devices as prescribed in this Plan. <br /> Professional Engineer Registration M36728 <br /> Signature: Number. <br /> Name: Jared Shuman, PE Tale: Consultant <br /> Company. Pacific Management Services Date: May 5, 2018 <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.