Laserfiche WebLink
8. Temporary Fence: A temporary fence will be placed around the ex- <br /> cavation and will remain in place until it is backfilled. <br /> 9. Backfill: Backfilling will be done by Jim Thorpe Oil personnel . <br /> Backfill material will be whichever is appropriate for the desired <br /> final condition. <br /> 10. Work Schedule: Work can begin within 14 days of SJPHS/EHD <br /> approval of this work plan and Mr Largins funding becoming avail- <br /> able. Sample analyses results should be ready for review within 2 <br /> weeks . <br /> 11. Health and Safety Plan: Attached. <br /> Respectfully submitted, <br /> JIM THORPE OIL, INC. <br /> dba I RUCTION <br /> i and Thorp <br /> President <br /> 3 <br />