My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2019 4:31:56 PM
Creation date
5/28/2019 1:02:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T-6 Construction, LLC <br /> 12470 N. Tully Road, Lodi, CA 95240, CA Lic#852887 <br /> *** PROPOSAL *** <br /> PrOPorel By: bob Holl.,PMna:fare)996-5763 Email: Job No. 1801 <br /> Propose!Date: 11/19/2019 Revised[M Revised Date: <br /> Customer: C1167 Attention: Bob Martin <br /> Mahn-eroear Company <br /> 47U Fite a <br /> Sbcldoi,CA 95215 <br /> Location:Name Same CONTACT#: 810-6730 <br /> Address 0 Operation: Oil Tank <br /> Cb 0 <br /> SCHEDULE AND PRICES:T-6 CONSTRUCTION,hereinafter called Contractor,proposes to furnish material and/or labor described herein according <br /> to the following specification.*(Any added work ea1ra). <br /> Any unforeseen problems that may arise will be handled at our standard time and materials rate after agreed upon by bath <br /> Martin Brower lend T4 Comliuetidn LLC. <br /> SCOPE OF WORK <br /> Contractor propose to furnish all of the necessaryto complete the fallowing scope of work. (see checked bares) <br /> =Labor OMat.rial OEymipm.m <br /> EXCLUDES AT THE TIME <br /> =PERMITS OFEE'G GPECIALINGPECTIONG =ELECTRICAL =PLUMBING <br /> =PLANS =ENGINEERING =HVAC =RREGPRINKLERG <br /> =Weekend or AFTER HOURS WORKED =OTHER <br /> onez Description <br /> Installation of the new oil tank <br /> 1 Provide engineered drawings from Capp Engineering <br /> 2 Apply for the permit &pay the fee's <br /> 3 Mount new tank per engineered drawings <br /> 4 Kleinfelder to preform the special inspection <br /> 5 Clean up and close out the permit <br /> 6 <br /> 7 This project will be preformed at our standard Time &Materials rate <br /> 8 <br /> 9 If you have any questions please feel free to give me a call <br /> 10 <br /> 11 <br /> EEL- <br /> 12 i <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 - <br /> 21 <br /> 22 <br /> 23 <br /> Sco a of Work & Pro osal Total continued on next a e <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.