My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS 1986 -1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
WORK PLANS 1986 -1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:09:57 PM
Creation date
5/28/2019 2:04:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
1986 -1993
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental <br /> Science & <br /> r---= Engineering,Inc. <br /> y� A CILCOHP Company <br /> October 8, 1990 <br /> Project No. 02-531-004 <br /> Ms Mary Raygoza, Environmental Coordinator <br /> Delta Truck Sales <br /> P.O. Box 8068 <br /> Stockton, CA 94208 <br /> SUBJECT: Work Plan for Site Investigation- and Overexcavation around former <br /> underground tanks in the Thomas Yard, Delta Truck Sales, Stockton, <br /> California. <br /> Dear Mary: <br /> Environmental Science & Engineering, Inc. (ESE) presents this Work Plan to estimate the <br /> lateral and vertical extent of hydrocarbons in the soil beneath the building near the <br /> excavation of underground fuel tanks and'product lines removed from the Thomas Yard at <br /> 3437 Newton Road;Stockton, California. This Work Plan also covers overexcavation of the <br /> site, except for the building, to remove soil containing hydrocarbons. <br /> Background <br /> Figure 1 - Site Plan shows the locations and analytical results of five soil samples obtained <br /> when the tanks and product piping were removed in January 1989. ; 'Total Petroleum <br /> Hydrocarbons as gasoline (TPHG) were found at concentrations of 12 and 2,200 parts per <br /> million (ppm), levels of Total Petroleum Hydrocarbons as-diesel (TPHD) ranged from- <br /> nondetectable (ND<10) to 5,500 ppm. Benzene,Toluene,Ethylbenzene, and Xylenes were- <br /> found at concentrations ranging from nondetectable (<0.025-25) to-300 ppm. One of the <br /> three samples contained 9 ppm lead (detection limit 5 ppm). Three samples analyzed for <br /> Ethylene Dibromide contained nondetectable (<0.25-25 ppm) concentrations. <br /> Significant levels of-hydrocarbons appeared to be limited to samples 5 and 2, taken from <br /> beneath the product lines and the west end of the diesel tank, respectively. The proposed <br /> work involves deepening and enlarging (overexcavating) the excavation to remove the soil <br /> containing hydrocarbons, and drilling and sampling one or more soil borings within the <br /> building to assess the lateral and vertical extent of hydrocarbons in the soil beneath the <br /> building. <br /> 597 Center Avenue,Suite 350 Martinez,CA 94553 Phone(415)372-3637 Fax(415)372-3790 <br /> Formerly known as Hunter/Gregg,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.