My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
SITE INFORMATION AND CORRESPONDENCE 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:57:40 PM
Creation date
5/28/2019 2:40:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2002 - 2013
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> a Messrs Trommer and Larson <br /> 16 June 2008 <br /> Preliminary Five-Year Review Letters Page 7 of 7 <br /> Various Sites <br /> 11530 Eight Mile Road, W. <br /> • The CUF recommended directing assessment and implementation of active <br /> remediation; the EHD agrees with the intent of the recommendation, but believes <br /> that that directive should be withheld until a pending report of findings from a <br /> recently complete deep delineation investigation and a pending SCM has been <br /> received and reviewed by the EHD. <br /> 14749 Thornton Road, N. <br /> The CUF recommended evaluation of the sampling frequency and <br /> implementation of SVE/IAS. The EHD agrees with the recommendation; a RAP <br /> has been approved, the needed wells have been installed and the remediation <br /> system is under construction. <br /> 156157 th Street, S. <br /> • The CUF recommended implementation of active remediation without delay; the. <br /> EHD agrees with this recommendation. A favorable pumping test has been <br /> completed and reported, DPE has been approved for the site, the system has <br /> been installed and permits to operate are pending from the City and SJVUAPCD. <br /> 23569 Santa Fe Road, S. <br /> • The CUF recommended termination of SVE and monitoring groundwater for one <br /> hydrological cycle. The EHD agrees with the recommendation;. a work plan to <br /> install fourteen MIP borings on and off site has been approved. <br /> 800 Main Street, E. <br /> • The CUF agreed with.the EHD on the approved. remedial work plan. <br /> Questions.or comments should be directed to the appropriate caseworker. <br /> Sincerely, <br /> I <br /> Harlin Knoll, REHS ,�y� Michael InUma, REHS. <br /> Senior Registered Environmental 'Q Senior Registered Environmental <br /> Health Specialist Health Specialist <br /> Nuel Henderson, PG Margaret Ldqorio, REHS <br /> - Engineering Geologist Program Coordinator <br /> i <br /> i <br /> 5-Year Review Comment Letter.061608.doc <br /> j <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.