My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012575
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
ARCHIVED REPORTS XR0012575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 3:44:25 PM
Creation date
5/28/2019 2:49:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012575
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOIL SAMPLING PIAN <br /> AT THE <br /> 3437 NEWTON ROAD SITE <br /> BACKGROUND: <br /> Analytical results of five soil samples were obtained when underground <br /> fuel tanks were removed by Thorpe Oil in January of 1989. Based on the <br /> high concentrations of Total Petroleum Hydrocarbons (Gasoline and Diesel) <br /> remediation of the site was requested by the Department of Environmental Health. <br /> On Octube: 18, 1990, Environ,mental Science and Engineering, Inc. <br /> i.mpiemented the remediation process through overexcavation of the site <br /> and a soil boring in the building adjacent to the excavation with a <br /> hollow-stem auger drilling rig. Based upon the soil boring and samples <br /> taken during excavation tfie following was concluded: <br /> - Soil beneath the building is clean, <br /> ' - Groundwater beneath site has probably not been affected, and <br /> - Overexcavation was successful in removing soil containing <br /> hydrocarbons. <br /> } The approximate yards of material excavated at this site was 800 cubic yards <br /> as determined by Environmental Science and Engineering, Inc.. <br /> SCOPE OF WORK: <br /> Five s�.il samples will be collected from the 800 cubic yards of soil on <br /> site. Each sample will be pulled.from 3 to 4 feet in the stockpile by an <br /> EPA certified laboratory for chemical analysis. <br /> Three samples will be composites and two. will be discreet. All samples <br /> will be analyzed for total petroleum hydrocarbons (TPH-G & TPH-D) and BTEX. i - <br /> Bioassay analysis and the WET scan for metals will also be performed on all <br /> samples collected. <br /> Attachment I shows a simple overview of the Newton Road.site identifying <br /> the stockpiles.and the soil sample locations.. <br /> REPORT OF FINDINGS: <br /> Upon receipt of the laboratory results Delta Truck Sales, Inc. will determine <br /> the appropriate remedial alternative. <br /> - <br /> f. <br /> ;T7- <br /> NO <br /> f :, t <br />
The URL can be used to link to this page
Your browser does not support the video tag.