Laserfiche WebLink
T ra'9'"'—z"ie'";ca Adr^'.au'e,sn Fr.��iae na kanohrs ,a..�`3k...rYzuwr.,. :xx*r�.w.u _..... ...-� ,.,.+i ✓, ,'. s�"''x- Ly'�-N "t ,IJ rn K yFr.•,e�� 1 <br /> t },t. �, .: � <- .u.�rF•y`h-Y l�fr�'?C+" t 'a .. -5 .s Sv C+T, � 'dn; ;r.d%f"x* f 7.a F.il h• .J � ? - � -,_ - <br /> � _��:"' -..... .,. -:.+ ,.;,, :,"` -^- -_'�tt,-•r..�'^rri-'. °rsa-'.F r�+ �,+t — n _ - �p __..� F r. 'a„� M-"Fart-r 's u r<-�Ya�at',rT` <br /> � ky .- __- .,__. �..-•xn. ,..;"'-«' 'f' i+«.n"'Y.,",l.w.'�'y�.�gr-'!'".ure...;...., f - '^--...11....e- �'l '�,�. � -'s ,_ <br /> V <br /> -{5S ty <br /> M <br /> v,f, <br /> r:\+ruj c c,s\5 31 x62\h1 t h&srt <br /> 1.0 INTRODUCTION <br /> This plan establishes and presents the health and safety procedures to be used as guidelines <br /> for the site assessment and overexcavation activities near the underground tank excavation <br /> at the Thomas Yard at 3437 Newton Road Stockton, CA shown on Figure 1 - Location <br /> Map.The purpose of this plan is to identify procedures for avoiding hazards which may be <br /> present on the site in the form of onsite chemical contamination as well as equipment <br /> hazards. The provisions of the plan apply to all Environmental Science & Engineering, <br /> r_. Inc- (ESE) employees,subcontractors, and visitors to the site as wcll as Federal, State and <br /> local agency officials. All are expected to exercise good judgment and follow the safety <br /> i rules and regulations established by their individual organizations as well as those rules and <br /> procedures outline6 in this document. <br /> s <br /> I There currently exists on site an Ushaped excavation approximately 40 feet long by 10 feet <br /> wide by 10 feet deep on one side, and 30 feet long by 10 feet wide by 15 feet deep on the <br /> other side. This hole was dug to remove a 10,000 gallon diesel tank,2,000 gallon gasoline <br /> ' tank, and the associated piping. <br /> ± The work plan calls for the drilling and sampling of one or more borings within the building <br /> s next to the excavation to assess the lateral and vertical extent of soil containing <br /> ,._ hydrocarbons, and to enlarge the excavation (overexcavate) to remove sur-iaueding soil <br /> + containing hydrocarbons. <br /> The excavating and sampling will be accomplished with an excavator and the boring(s)will <br /> be drilled with a small hollow-stem auger rig. <br /> 2.0 PROJECT SAFETY PERSONNEL <br /> Personnel responsible for the project safety are the Project Safety Officer, the Project <br /> Manager and the Health and Safety Officers. <br /> The Health and Safety Officer is responsible for the delivering the plan and all pertinent <br /> addenda to the Project Manager and for advising the Project Manager and Project Safety <br /> Officer on health and safety matters. He has the authority to monitor and audit compliance <br /> with the provisions of the plan,suspend work or modify work for safety reasons,and dismiss <br /> individuals whose conduct on-site endangers the health and/or safety of others. <br /> The Project Manager is responsible for the distribution of the plan to all field personnel <br /> and to an authorized representative of cacti firm contracted to assist with the on-site work. <br /> The Project Manager is also responsible for implementing the plan and its addenda. <br /> Implementation includes review of field personnel's compliance with medical and <br /> information requirements, training of field personnel involved with the project, provisions <br /> for appropriate safety equipment, and that the required safety documents be submitted to <br /> 1 <br />