My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012575
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
ARCHIVED REPORTS XR0012575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 3:44:25 PM
Creation date
5/28/2019 2:49:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012575
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> Ms. Darlene Reuss <br /> August 15, 1990 <br /> Page 3 <br /> be developed by pumping at least three to five well volumes of water. After <br /> development, ground-water samples will be obtained from each well with a <br /> bailer and sent to a laboratory to be analyzed for TPH-G, TPH-D, and <br /> BTEX. <br /> TASK 2 Gmund Water Sampling with a Hydropunch Tool. An additional ground- <br /> wat,r sample will be obtained beneath the location of deepest hydrocarbon <br /> penetration into the soil, near Boriug B11 on Figure 2. This sample will be <br /> obtained by drilling with a hoIlow-stem auger to within 5 feet of the saturated <br /> zone and driving a Hydropunch tool several feet into the saturated zone. <br /> Water wiII collect through a screened portion of the tool and will be retrieved <br /> with a bailer. This water sample will be analyzed for TPH-G, TPH-D, and <br /> BTEX. Before the Hydropunch tool is driven,a soil sample will be obtained <br /> from immediately above the saturated zone with a split-spoon sampler. The <br /> soil sample will also be analyzed for TPH-G, TPH-D, and BTEX. <br /> The hole will be sealed with bentonite hole plug after the tool is withdrawn. <br /> The Hydropunch is recommended for this sampling location because it is <br /> more cost effective than a well installation, and a well would have to be <br /> destroyed if the soil from this area is excavated. <br /> TASK 3 Prepare a Ground Water Investigation Report. A ground water investigation <br /> report will be prepared including the analysis and interpretation of the data <br /> obtained in the above tasks. Additional water elevation data will be obtained <br /> . j from other proposed monitoring wells on the site. The report will include <br /> boring logs, hydrocarbon concentration maps, ground-water elevation maps, <br /> and other data pertinent to the investigation. <br /> Please call Paul Graff at (415;,372-3637 with any questions or comments concerning this <br /> proposed work plan. - <br /> 1 <br /> Sincerely, <br /> JVIRONMENTAL SC, NCE & ENGINEERING, INC. <br /> Paul K. Graff <br /> Senior Associate Geologist <br /> Attachments-Figure 2 <br /> Table 1 <br /> ` [:\prc'ats\531-003\wor4lan.gw <br />
The URL can be used to link to this page
Your browser does not support the video tag.