Laserfiche WebLink
19 March 1999 <br /> AGE-NC Project No 97-0312 <br /> Page 4 of 4 <br /> O The next quarterly monitoring event is scheduled for March 1999 In accordance with <br /> monitoring requirements from the PHS-EHD, monitoring wells UST-1 through UST-5 and <br /> the two domestic wells at the site will be sampled at that time <br /> 6.0. ]LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluation of the <br /> geologic/hydrogeologic conditions at the site for the purpose of this investigation was made from <br /> a limited number of available data points (i a ground water samples, soil samples) and subsurface <br /> conditions may vary away from these data points No other warranty, expressed or implied, is made <br /> as to the professional recommendations contained in this report <br /> J <br /> Advanced GeoEmironmentai,Inc <br />