Laserfiche WebLink
CECCHINI, CECCHINI,AND GIOVANNOM,PVWNG ISLAND <br /> 5.0 RECOMMENIDATEONS <br /> 1 ESE recommends continued quarterly monitoring of all monitoring wells at the site The <br /> recommended monitoring program is as follows <br /> • Quarterly water level measurements in all monitoring wells, including the small and <br /> large water supply wells. <br /> • Continuance of Quarterly ground water sampling with analysis for TPH as gasoline <br /> and diesel and BTEX in wells UST-1 through UST-4; and <br /> • Quarterly reporting of all site activities related to the underground tank area (fueling <br /> island) including interim remediation <br /> 2 Due to the continued presence of low concentrations of petroleum hydrocarbons in well <br /> UST-1, ESE recommends continuation of interim remedial activities for the Third Quarter <br /> of 1995 on a bi-weekly basis or until it is necessary to abandon the well in preparation for <br /> demolition and remodeling of the fueling island <br /> F 1692540012QM95 RPT 8 EnvfrownenW Science do Engineering,Inc <br />