Laserfiche WebLink
4.® R ECOMM ENDATRONS <br /> 1 ESE recommends continued quarterly monitoring of all monitoring wells at the site <br /> The recommended monitoring program is as follows <br /> o wells including the small <br /> Quarterly water level measurements m all monitoring g <br /> and large water supply wells <br /> 0 Continuance of Quarterly ground water sampling with analysis for TPH as <br /> gasoline and diesel and BTEX in well UST-1, and <br /> 0 Quarterly reporting of all site activities related to the underground tank area <br /> (fueling island) including interum remediation <br /> 2 Due to the continued presence of low concentrations of petroleum hydrocarbons to well <br /> UST-1, FSE recommends continuation of interum remedial activities for the Fourth <br /> Quarter of 1994 on a bi-weekly basis <br /> i <br /> 1 <br /> 3 Additional ground water monitoring wells and vadose zone recovery wells should be <br /> placed at the site in order to assess the presence of a plume of petroleum hydrocarbons <br /> in ground water and remediate the unsaturated soil zone <br /> F 16M4M3gm94 rpt 5 Environmental Science A Engineering Inc <br />