My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001927
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
ARCHIVED REPORTS XR0001927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 3:40:41 PM
Creation date
5/28/2019 3:11:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001927
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOND QUARTER - <br /> 1994 GROUND WATER lYi ONnT®RIING RIEFORT <br /> 3535 E. CHEROX EIE ROAD, STCCIK'I 0N, CAILIIIF®I[8l\ll<A <br /> 1.0 llNTRODUCTEON <br /> The following report documents Second Quarter 1994 ground water monitoring for the fueling <br /> island area at 3535 East Cherokee Road, Stockton, California (Figure 1 - Vicinity Map) In <br /> addition, this report documents two additional tasks performed this quarter that are related to the <br /> project <br /> 11 BACKGROUND <br /> One well, designated UST-1, is located in the fueling island (Figure 2 - Relative Ground Water <br /> Elevation - April 28, 1994) Well UST-1 had problems with leakage of fuel from the surface and <br /> was repaired twice in 1993 The latest repair was made in March 1993 when ESE placed a <br /> second cover and re-fitted the water tight seal on the well <br /> In October 1992 ESE implemented a quarterly momtoring program that includes well UST-1 <br /> As of July 1, 1993 the monitoring program also included water level measurements in three <br /> additional ground water monitoring wells (SI-1, SI-2, and SI-3, Figure 2) located in the northern <br /> portion of the site <br /> 1 2 WORK PERFORMED SECOND QUARTER 1994 <br /> Three tasks were performed in the Second Quarter of 1994 at the fuel island site These tasks <br /> are as follows <br /> 0 Domestic well surveying, <br /> 0 Ground water monitoring, and <br /> 0 Ground water recovery as an interim remediation measure <br /> F 1692540012gm94 rpt 1 Envrronmenlal Science&Engmeermg Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.