My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001928
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
ARCHIVED REPORTS XR0001928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 3:47:45 PM
Creation date
5/28/2019 3:12:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001928
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IFE R.ST QUARTER 1994 <br /> GROUND WATER MONITORING REPORT <br /> 3535 E. CHEROKEE ROAD, STOCKTON, CAILR FOIRNEA1 <br /> 1.0 INTRODUCTION <br /> The following report documents First Quarter 1994 ground water morutoring for the fueling <br /> island area of the subject site (Figure 1 - Vicinity Map) In addition, this report documents <br /> two additional tasks performed this quarter that are related to the project <br /> 11 BACKGROUND <br /> One well, designated UST-1, is located in the fueling island (Figure 2 - Relative Ground <br /> Water Elevation - January 27, 1994) Well UST-1 had problems with leakage of fuel from <br /> the surface and was repaired twice in 1993 The latest repair was made in March 1993 <br /> when ESE placed a second cover and re-fitted the water tight seal on the well <br /> In October 1992 ESE implemented a quarterly monitoring program that includes well UST- <br /> 1 As of July 1, 1993 the monitoring program also included water level measurements In <br /> three additional ground water monitoring wells (SI-1, SI-2, and SI-3, Figure 2) located in the <br /> northern portion of the site <br /> 12 WORD PERFORMED FIRST QUARTER 1994 <br /> Three tasks were performed in the First Quarter of 1994 at the fuel island site These tasks <br /> are as follows <br /> O Domestic well research, <br /> Ground water monitoring, and <br /> G Ground water recovery as an interim remediation measure <br /> F\6925400\1ymM rpt 1 Environmental Science&Engmeenn& Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.