Laserfiche WebLink
IFE R.ST QUARTER 1994 <br /> GROUND WATER MONITORING REPORT <br /> 3535 E. CHEROKEE ROAD, STOCKTON, CAILR FOIRNEA1 <br /> 1.0 INTRODUCTION <br /> The following report documents First Quarter 1994 ground water morutoring for the fueling <br /> island area of the subject site (Figure 1 - Vicinity Map) In addition, this report documents <br /> two additional tasks performed this quarter that are related to the project <br /> 11 BACKGROUND <br /> One well, designated UST-1, is located in the fueling island (Figure 2 - Relative Ground <br /> Water Elevation - January 27, 1994) Well UST-1 had problems with leakage of fuel from <br /> the surface and was repaired twice in 1993 The latest repair was made in March 1993 <br /> when ESE placed a second cover and re-fitted the water tight seal on the well <br /> In October 1992 ESE implemented a quarterly monitoring program that includes well UST- <br /> 1 As of July 1, 1993 the monitoring program also included water level measurements In <br /> three additional ground water monitoring wells (SI-1, SI-2, and SI-3, Figure 2) located in the <br /> northern portion of the site <br /> 12 WORD PERFORMED FIRST QUARTER 1994 <br /> Three tasks were performed in the First Quarter of 1994 at the fuel island site These tasks <br /> are as follows <br /> O Domestic well research, <br /> Ground water monitoring, and <br /> G Ground water recovery as an interim remediation measure <br /> F\6925400\1ymM rpt 1 Environmental Science&Engmeenn& Inc <br />