Laserfiche WebLink
4 ( 1 <br /> 30 August 1999 <br /> AGE-NC Project No 97-0312 - <br /> Page 8 of 8 _ <br /> 1 <br />' approximately 12 additional borings is in preparation and will be submitted to the PHS-EHD <br /> for approval prior to drilling <br /> The next quarterly monitoring event should be scheduled for September 1999 In,acdordance <br /> with monitoring requirements from the PHS-EHD, monitoring wells UST-2 through UST-6 <br /> will be sampled at that time N <br /> 60. LIMITATIONS <br /> r <br /> Our professional services'were performed using that degree of care and skill ordinarily exercised by - <br />' environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratoi y Evaluation of the <br /> geologic/hydrogeologic'conditions at the site for the purpose of this investigation was made from <br /> Ia limited number of available data points (i e ground water samples, soil samples) and subsurface <br /> conditions may vary away from these data points No other warranty, expressed or implied, is made <br /> as to the professional recoinmendations'contained in this report <br /> r <br /> 1 <br /> I 1 s <br /> 3 F <br /> N <br /> t <br /> I 1 <br /> t r <br /> 4 <br /> Aril arced Geo Ln%iron nzenul,Inc <br /> 1 <br />