Laserfiche WebLink
Geological Technics lne. <br /> Page 4 , <br /> Work Plan . <br /> Project No. 1128.2 <br /> October 22,2003 <br /> nfurna an addendum to'this plan proposing the final disposal <br /> We will provide you and Mr. I f� p p p g <br /> method. <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 10 days after work <br /> plan approval, issuance of the drilling permit, and approval of the cost for this work. <br /> The information gathered during this phase of work will be presented in a report. Dr. Ray <br /> Kablanow, a registered geologist, will supervise this ;project. ' Copies of the report will be <br /> forwarded to San Joaquin County Environmental Health Department. <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the <br /> time of this investigation. Geological Technics Inc. is not responsible for undisclosed <br /> conditions. <br /> This work plan was prepared by: <br /> ':Q4oE�ssion,,4, <br /> �a coo <br /> yam,R.1,KAMANOW U r0 <br /> No.52U <br /> r Raynold 1. Kablanow II, Ph.D.California <br /> I� <br /> Certified Hydrogeologist#4istered 4tist#5234 <br /> 2 C <br /> h. <br /> L <br />