Laserfiche WebLink
4,eological7'ecknksInc. Page 4 <br /> Work Plan <br /> Project No. 1128.2 <br /> October 22,2003 <br /> We will provide you and Mr. Infurna an addendum to this plan proposing the final disposal <br /> method. <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 10 days after work <br /> plan approval, issuance of the drilling permit, and approval of the cost for this work. <br /> The information gathered during this phase of work will be presented in a report. Dr. Ray <br /> Kablanow, a registered geologist, will supervise this project. Copies of the report will be <br /> forwarded to San Joaquin County Environmental Health Department. <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the <br /> time of this investigation. Geological Technics Inc. is not responsible for undisclosed <br /> conditions. <br /> This work plan was prepared by: <br /> Q�aQeEssl�^�r <br /> R.I.KNBZAI`10Vd N orp <br /> (A <br /> Raynold I. Kablanow 11, Ph.D. t40.52.0 <br /> California Registered Geologist#5234 * B•3 t. m`$ <br /> Certified Hydrogeologist#442 ,q �a°$ <br /> p�CAa�rrQ <br />