Laserfiche WebLink
15 April 2008 <br /> AGE-NC Project No. 11-1900 <br /> Page 4 of 4 <br /> 3.4. EQUIPMENT DECONTAMINATION <br /> Prior to use, all sampling tools used for sample collection will be thoroughly rinsed with <br /> clean water after being washed with a solution of Alconox. All probing rods will be cleaned <br /> prior to advancement at each probe boring location. <br /> 3.5. BORING ABANDONMENT <br /> The probe borings will be permanently sealed to prevent vertical migration of potential <br /> contaminants. Soil boring shall be abandoned by backfilling with portland cement from the <br /> total depth to surface grade. <br /> 3.6. REPORT PREPARATION <br /> Upon completion of field work and receipt of final laboratory analysis, a report will be <br /> prepared presenting the findings of the investigation. The report will include a description <br /> of the work performed and the results of the sampling and analysis. The report will be in <br /> a format acceptable to the EHD and will be reviewed and signed by a California <br /> Professional Geologist. <br />