My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
5279
>
2900 - Site Mitigation Program
>
PR0515087
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 4:49:39 PM
Creation date
5/28/2019 4:46:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515087
PE
2950
FACILITY_ID
FA0012040
FACILITY_NAME
MORENO TRUST
STREET_NUMBER
5279
Direction
E
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08705305
CURRENT_STATUS
01
SITE_LOCATION
5279 E CHEROKEE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06 June 1999 <br /> AGE-NC Project No. 99-0616 <br /> Page 3 of 7 <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> SupportZone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator (if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Robert Chalmers Collect soil samples; direct probing <br /> FIELD CREW: TASK: <br /> GeoProbe Operator Advance borings <br /> Field Technician (if nec.) Clean equipment <br /> The work party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.