My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
5463
>
2900 - Site Mitigation Program
>
PR0523785
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 4:59:09 PM
Creation date
5/28/2019 4:55:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523785
PE
2965
FACILITY_ID
FA0016022
FACILITY_NAME
CHEROKEE FREIGHT LINES
STREET_NUMBER
5463
Direction
E
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
952151120
APN
08712143
CURRENT_STATUS
01
SITE_LOCATION
5463 E CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED MONITORING ANAPORTING PROGRAM NO. 98-077 • 4_ <br /> CHEROKEE FREIGHT LINES <br /> SAN JOAQUIN COUNTY <br /> REPORTING <br /> In reporting monitoring data, the Discharger shall arrange the data in tabular form so that the date, <br /> sample type (e.g., Influent Monitoring, Land Application Area Monitoring, etc.), and reported <br /> analytical result for each sample are readily discernible. The data shall be summarized in such a <br /> manner to clearly illustrate compliance with waste discharge requirements and spatial or temporal <br /> trends, as applicable. The results of any monitoring done more frequently than required at the locations <br /> specified in the Monitoring and Reporting Program shall be reported in the next scheduled monitoring <br /> report. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> groundwater monitoring reports shall be prepared under the direct supervision of a California licensed <br /> registered professional engineer or geologist and signed by the registered professional. <br /> A. Monthly Monitoring Reports <br /> Monthly reports shall be submitted to the Regional Board by the 1" day of the second month <br /> following the. end of the reporting period(i.e. the January monthly report is due by 1 March). <br /> Monthly reports for the months of March, June, September, and December may be submitted as <br /> part of the Quarterly Monitoring Report, if desired. The monthly reports shall include the <br /> following: <br /> 1. Results of influent, effluent, stormwater pond, land application area, and solids monitoring; <br /> 2. A comparison of monitoring data to the discharge specifications and an explanation of any <br /> violation of those requirements. Data shall be presented in tabular format; <br /> 3. If requested by staff, copies of laboratory analytical report(s); <br /> 4. A calibration log verifying calibration of all hand held monitoring instruments and devices <br /> used to comply with the prescribed monitoring program; <br /> 5. The total pounds of total dissolved solids (year to date) that have been applied to the land <br /> application area, as calculated from the sum of monthly loadings; and <br /> 6. The total pounds of nitrogen (year to date, from all sources including fertilizer) applied to <br /> the land application area as calculated from the sum of monthly loadings. <br /> 7. A comparison of the wastewater generation flow rate with the wastewater application rate. <br /> If the values differ by more than six-percent,the Discharger shall submit a technical report, <br /> prepared by a California licensed engineer that describes how the discrepancy will be <br /> corrected. Such report shall be submitted within 60-days of the monitoring report that <br /> details the discrepancy. <br /> B. Quarterly Report <br /> Beginning with the fourth quarter 2004, the Discharger shall establish a quarterly sampling <br /> schedule for groundwater monitoring such that samples are obtained approximately every three <br /> w:�wWbnaiT=Ju wn� FluonMftR wW AixP.tla <br />
The URL can be used to link to this page
Your browser does not support the video tag.