• Physical character of removed water, to include changes during development in <br /> clarity, color, particulates, and odor. <br /> • Type and size/capacity of pump and/or bailer used. <br /> • Description of surge technique. <br /> • Height of well casing above ground surface. <br /> • Quantity of fluid/water removed and time for removal (present both incremental <br /> and total values). <br /> Water removed from the well for development will not be counted toward the volumetric <br /> removal requirements of any pre-sample purging. <br /> Following completion of the work, the contractor will remove from the premises and <br /> work areas all excess materials, tools, and equipment used in the execution of the work, <br /> and will properly dispose of all construction and development debris. <br /> E. WELL SURVEY <br /> The elevation of the top of the interior well casing (north side) will be determined by a <br /> licensed land surveyor. The elevation reference point at each monitoring well will be <br /> measured within 0.01 foot. This elevation will be the basis for determining the depth to <br /> groundwater. The surveyor will also determine the coordinates of the well (i.e., northings <br /> and eastings). <br /> F. SCHEDULE FOR COMPLETION OF WORK <br /> As indicated above,the NOV issued to CFL includes a Workplan submittal deadline of <br /> 30 July 2004, and a well installation completion date of 30 September 2004. Based on <br /> the dates provided by the Regional Board, and pending approval of this Workplan, the <br /> following schedule is assumed: <br /> Action Target Completion Date <br /> Submit Workplan to Regional Board 30 July 2004 <br /> Regional Board Approval of Workplan 13 August 2004 <br /> Retention of Drilling Contractor and Geologist and 27 August 2004 <br /> Coordination of Permits and Utility Clearances <br /> Monitoring Well Installation and Development and 24 September 2004 <br /> Groundwater Sample Collection <br /> Submit Report of Results to Regional Board 29 October 2004 <br /> Project Workplan 7 SA1433 <br /> July 30,2004 n:sa0I433\gwmwiwp\workplan.doc <br />