My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
5463
>
2900 - Site Mitigation Program
>
PR0523785
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 5:02:08 PM
Creation date
5/28/2019 4:55:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523785
PE
2965
FACILITY_ID
FA0016022
FACILITY_NAME
CHEROKEE FREIGHT LINES
STREET_NUMBER
5463
Direction
E
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
952151120
APN
08712143
CURRENT_STATUS
01
SITE_LOCATION
5463 E CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROFESSIONAL ACnrr r <br /> MICHAEL NEIL CLARK <br /> TITLE President and Chief Operations Officer. <br /> EXPERTIa Establishes the overall direction of Company <br /> participation in hazardous waste and environmental <br /> projects, and geohydrologic, geologic, and <br /> geotechnical investigations. Personally oversees <br /> all projects undertaken by Applied GeoSystems. <br /> Functions as the Company's Head of Geotechnical <br /> Studies and reviews all aspects of proposals and <br /> contracts, project design, and report completion. <br /> UPER ENCE Has conducted geologic and <br /> al <br /> investigations throughout the oUnitedcSt <br /> including hazardous waste contaminated <br /> States <br /> water mitigation, development Of Water red ground- <br /> basin evaluations, foundation and retaining wall <br /> designs, large-area geologic hazard mapping <br /> projects, fault and landslide investigations, <br /> seacliff stability studies, geophysical data <br /> interpretations, and analyses of aerial <br /> photographs. Has been in responsible charge of <br /> geotechnical and hydrogeologic projects for over <br /> 10 years. <br /> Engaged in environmental and hazardous waste <br /> projects. Developed ground-water monitoring <br /> systems for defining contaminant migration <br /> potential. Designed and installed complete <br /> ground-water removal systems for both single- and <br /> multiple-phase projects which include water <br /> treatment systems. Completed vadose monitoring <br /> and hydrocarbon mitigation systems using soil <br /> venting. <br /> Conducted site evaluations and remediation for <br /> Superfund projects related to both the petro- <br /> chemical and semiconductor industries. <br /> EMPLOYMENT Applied GeoSystems, <br /> ISTOR1985 - present <br /> Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.