Laserfiche WebLink
05/29/96 15:56 FAX 916 387 0802 DAMES & MOORS Z0O3 <br /> Presented below is breakdown of the scope of work by subtask. The subtasks are presented on a per <br /> day basis. Please tote that the time estimates are approximate and will be dcpendent on Held conditions. <br /> Day I �vI vi I9' ° <br /> 1, The existing depth of approximately 4I7 feet will be verified by tagging bottom. The depth will be <br /> Memoramdutn by D <br /> rmomitored prior D and following each activity, and the observations recorded on the Dally Field <br /> ames & Moore. <br /> 2_ The caamg will be wire brushed by BUR to remove scale. <br /> 3. A footing or floor for grouting will be placed at the existing total depth of the well by Beylik. The <br /> floor will be placed by trying either a grout basket or pea gravel to approximately 412 feet below <br /> gfound surface(bgs). followed by a sand bridge to approximately 410 feet. Bentonite pellets will be <br /> available for use if there is difficulty in establishing a floor. ' 11 <br /> 4. Using a tremae supplied by Beylik drd1mg,grout will be pumped by Halliburton auto the first lift from <br /> bel m be feet. The grout volume will be calculated to ensure that the grout sets a minimum of 5 feet <br /> below the lowermost interval to be perforated. which is from 362 to 370 feet bgs. The purpose of this <br /> lift is to provide a plug as a secure base for grouting the remaining two lifts A -plug back spot <br /> cemertt"hay been designed by Halliburton specifically for this purpose on this project. It consists of <br /> a sant/and cement mix of 50 pounds of sand per sack of Halliburton Premium Cement, with 2 Percent <br /> calcium chloride added as an accelerator. The design density of this grout is 17.1 pouts per gallon <br /> actual density will be measured using struck-mounted densimeter and documented int the Daily <br /> The <br /> Field Memorandum. The grout will be tagged after setting, and additional grout added as <br /> This grout Plug will be allowed to set overnight. �ry <br /> 5. The second, or middle lift from 375 feet to 150 feet bgs will be grouted using a 14.2 pounds-per- <br /> gallon mix designed by Hallibunom This mix will consist of a 50150 mix of Pomtix A and Premium <br /> Cement with two Percent gel. A retardant will be added in an amount specifiW <br /> by Halliburton to <br /> ty time. The grout will be placed using a tremie supplied by Beylik <br /> allow for a 5 to 6 lour workabili 3 3 y <br /> and pumping truck Provided by Hali tburion. The density of this grout as placed will be measured and <br /> noted in the field records. In the event groundwater is displaced to the surface, this water will be l �/ <br /> retained by BeYlik and transported to the lined evaporation ponds located on site. The grout volume <br /> will be calculated based on the casing volume plus 30 percetm to allow for grout taken up into the <br /> annular space and formation. In the event additional grout beyondthe calculated amount is required, <br /> additional material can be supplied by Halliburton within 4 hours. 1_cv� <br />