My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I41,1111Cnt trt I u�l� tillh�t,ul�� „ntrtrl <br /> a, <br /> Itll � l I 'ru� lin A�.I . tiuilc <br /> WindonII Ilick.,e ti.n:1a11WHI, t 1111''r111.1 1) <br /> tieen-fai I, r lir:ft Ua�e; <br /> t;mcrnor <br /> Invimm�lcnl:Il <br /> Prok•cnun <br /> July 30, 1999 <br /> Commander <br /> ASCE-BE (Mr. Dale Clemons) <br /> Activity Services Center West <br /> Defense Depot San Joaquin, Tracy Site <br /> Building S-108, Sharpe Location <br /> P.O. Box 960001 <br /> Stockton, California 95296-0250 <br /> DRAFT REMEDIAL ACTION SOIL VAPOR EXTRACTION SITES 60 % DESIGN WORK <br /> PLAN FOR DEFENSE DEPOT SAN JOAQUIN, TRACY SITE <br /> Dear Mr. Clemons: <br /> The Department of Toxic Substances Control (DTSC) has completed their review of the <br /> above mentioned document dated May 1999. <br /> U.S. Environmental Protection Agency Remedial Design guidance indicates that the <br /> design should include a schedule and updated cost information, which may differ significantly <br /> from that contained the Feasibility Study (FS). Although a schedule is contained in Volume 3, <br /> Section 13, the cost information is not included in this design document and needs to be provided. <br /> The FS cost estimate is generally accurately to +50 to -30%, however, by the time the 100% <br /> Remedial Design is complete, the estimated cost figures should probably be within+/- 10 to 15% <br /> of the actual costs. <br /> Using the mass estimates included in the 60% design document and cost figures included <br /> in the FS, the cost per pound for the proposed actions range from—$4K to —$296K per pound. <br /> (SWMU 1, $70K/Ib; Area 1 - Building 237, $28K/Ib; Area 3, $4k/lb; SWMU 20/23 S296K/lb; <br /> SWMU 24 - Building 247, no TPH mass estimate). Given the relatively low level of contaminant <br /> mass at some of these sites, it is difficult to determine whether the clean-up is cost effective <br /> relative to the potential benefit. In the event that the cost effectiveness was not fully evaluated in <br /> the FS, the RD provides the opportunity to do so. <br /> California Hnvironmental Protection A,anc. <br /> Printed on Recycled Paper HM.dm <br /> HMSI W.O" <br />
The URL can be used to link to this page
Your browser does not support the video tag.