My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Systematic Design of Testing Protocols. The testing protocols were designed in <br /> advance of the testing period, and they reflect a conscientious effort to evaluate <br /> the facility's Y2K-related environmental compliance status and not to circumvent <br /> environmental compliance. <br /> (2) Violations Caused By Testing. The specific Y2K-related testing was the direct <br /> and proximate cause of the potential violations. <br /> (3) Testing Need. Timing & Leng. The specific testing that caused the potential <br /> violations was: <br /> (a) necessary to determine the effectiveness of specific Y2K-related modifications <br /> in ensuring environmental compliance; <br /> (b) part of a comprehensive testing program designed to correct all Y2K <br /> deficiencies at the facility; <br /> (c) conducted well in advance of the Y2K dates in question (i.e., normally at <br /> least 30 days in advance of the dates in question); and <br /> (d) conducted for the shortest possible period of time in order to determine the <br /> effectiveness of such modifications, not to exceed a testing period of 24 hours <br /> in duration. <br /> Where a facility, without making any modifications, tests existing equipment in <br /> order to determine whether Y2K-related problems may affect its environmental <br /> compliance status, the specific testing was: <br /> (e) necessary to determine the effectiveness of its existing operations in ensuring <br /> environmental compliance; <br /> (f) part of a comprehensive testing program designed to correct all Y2K-related <br /> deficiencies at the facility; <br /> (g) conducted well in advance of the Y2K dates in question (i.e., normally at <br /> least 30 days in advance of the dates in question); and <br /> E1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.