My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Water Modeling ITM• -2- • 29 December 1993 <br /> DDRW, Tracy <br /> 1993) showing ground water flow direction and gradient at the Triple E and Georgia Pacific <br /> sites are provided as attachments. This change in flow direction to the southwest of DDRW, <br /> Tracy may represent a ground water divide. This could affect boundary conditions and <br /> ground water flux within the model domain. <br /> 4. Board staff comments on Draft Ground Water Modeling Work Plan, 22 September 1993. <br /> Reference, telephone communication, 14 December 1993 with Mr. Peter LeVon of <br /> Montgomery-Watson: <br /> Comment 3: This comment was not specifically addressed in the Ground Water Modeling <br /> ITM. Mr. LeVon stated that a sensitivity analysis would be conducted. In addition, <br /> Mr. LeVon stated that all of the Boards comments on the Draft Ground Water Modeling <br /> Work Plan would be revisited and addressed in the next ground water modeling report. <br /> If you have any questions, please call me at (916) 255-3065. <br /> JAMES D. TAYLOR <br /> Associate Engineering Geologist <br /> JDT:jt <br /> Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.