My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Draft Ground Water Modeling Work Plan -2- 22 September 1993 <br /> DDRW, Tracy <br /> document be prepared. In addition, we request that DDRW, Tracy present status reports on <br /> model development during the Project Manager's Meetings in order to solicit agency input <br /> prior to finalization of the ground water modeling report. <br /> 2. The models will be used to simulate the current extent and to predict future migration of TCE <br /> and PCE. DDRW, Tracy should evaluate the cost-effectiveness of modeling other potential <br /> contaminant plumes from heavy metals or pesticides, should the site-wide remedial <br /> investigation verify the presence of these contaminants. <br /> 3. The Draft Ground Water Modeling Work Plan did not indicate whether a sensitivity analysis <br /> would be performed. DDRW, Tracy should consider performing a sensitivity analysis to <br /> quantify the uncertainty in the calibrated ground water flow and transport models. The <br /> normal uncertainties associated with the model parameters include hydraulic conductivity, <br /> vertical leakance, dispersivity and retardation factor. The sensitivity analysis will help to <br /> determine the adequacy of the proposed remedial design with respect to TCE and PCE plume <br /> containment and removal efficiency despite the uncertainties in model parameters. <br /> 4. We request that DDRW, Tracy summarize the calibration history of the ground water flow <br /> and contaminant transport models in tables. This summary format will help DDRW, Tracy to <br /> track development of the models and will help the reviewer to understand the procedures taken <br /> during calibration and verification of the models and should expedite the review process. <br /> 5. The Draft Ground Water Modeling Work Plan proposes to use a variable grid map for <br /> development of the models of which we approve. The Plan indicates that the finer grid will <br /> be used across the plume areas. It is unclear if constant grid spacing will be used both on- <br /> and off-site in plume areas. We recommend that the variable grid spacing be used in all areas <br /> of the plume, particularly off-site where the contamination is more extensive, in order to <br /> reduce the time needed for data manipulation and computer computation. <br /> 6. It is unclear if the ground water models will be used to evaluate the affects of the disposal <br /> system, including the injection well field and pond areas, on plume capture and overall aquifer <br /> cleanup. Model applications should include these analyses and specifically, should evaluate <br /> the location and pumping rates of the injection wells for the ground water remedial action. <br />
The URL can be used to link to this page
Your browser does not support the video tag.