My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��a; <br /> �paE°STo� UNITED STATES ENVIRONMENTAL PROTECTICPP A,tn� a:eITGL HEALTH <br /> A � Region 9 I .:(-Fr'uICE <br /> ��1j(t�►I 75 Hawthorne Street 93 SEA 27 PH 3: 0s <br /> San Francisco CA 94105-3901 <br /> September 20, 1993 <br /> Marshall Cloud <br /> Environmental Protection Office, DDRW-Tracy <br /> P.O. Box 960001 <br /> Stockton, CA 95296-0250 <br /> RE: Draft RD/RA Schedule for DDRW-Tracy OU-1 <br /> Dear Marshall, <br /> Thank you for the draft RD/RA schedule for OU-1, received in our office on <br /> September 3, 1993. Per the terms of the DDRW-Tracy FFA, EPA is providing comments <br /> within 15 days of receipt. <br /> EPA's major concerns are that (1) the only primary document proposed in the draft <br /> schedule is the remedial design document at the 30 percent stage, (2) it would appear that <br /> there is no proposed primary document (per the FFA) at any stage for the remedial action <br /> work plan, and (3) as proposed, the schedule does not provide a date for full-scale remedial <br /> action. Our comments are attached. <br /> Per the terms of the FFA, DDRW-Tracy is required to provide a revised RD/RA <br /> schedule within 15 days of receipt of regulatory comments. Please contact me at (415) 744- <br /> 2392, should you have any questions. <br /> Sincerely,A <br /> Michael Work <br /> Federal Enforcement Section I (H-9-1) <br /> Office of Superfund <br /> Attachment <br /> cc: (See Attached List) <br />
The URL can be used to link to this page
Your browser does not support the video tag.