Laserfiche WebLink
95% Remedial Design -2- • 30 August 1993 <br /> DDRW, Sharpe <br /> develop a plan to prevent this in the future. This may require different management of the <br /> storm water runoff and may require wellhead treatment as pretreatment for this extraction <br /> well. Dilution with other extracted water is not an acceptable solution to the problem. The <br /> dry wells should be addressed as a waste management unit (WMU) in the comprehensive <br /> feasibility study (FS) in order to address this issue. <br /> If you have any questions, please call me at (916) 255-3065. <br /> J /ES TAYLOR <br /> Associate Engineering Geologist <br /> JDT:jt <br /> Enclosure <br /> cc: Ms. Catherine Johnson, U. S. Army Environmental Center, Aberdeen Proving Ground, <br /> Maryland <br /> CPT Mike Dell'Orco, U. S. Army Corps of Engineers, Huntsville, Alabama <br /> Mr. Richard Seraydarian, U. S. Environmental Protection Agency, Region IX, San Francisco <br /> Ms. Tracie Billington, Department of Toxic Substances Control, Region 1, Sacramento <br /> Mr. Fred Kaufman, Public Health Services of San Joaquin County, Environmental Health <br /> Department, Stockton <br /> Mr. John Porcella, Montgomery Watson, Walnut Creek <br />