My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��r,a ST�rFs • <br /> i 'low 0 <br /> UNITED STATES ENVIRONMENTAL PROT6C(tRN AGENCYHEALTH <br /> ;e"'+ DoE aecioH ixpERt`+s SERVICE <br /> 75 Hawthorne Street <br /> San Francisco, Ca. 94105.3901 AUG 23 PH 2: 20 <br /> August 17, 1993 <br /> Michael W. Mcllvoy <br /> Director, Office of Public Safety <br /> DDRW-Tracy <br /> P.O. Box 960001 <br /> Stockton, CA 95296-0250 <br /> RE: CERCLA Section 120(e)(2) and the DDRW-Tracy OU-1 Remedial Design Schedule <br /> Dear Mr. Mcllvoy: <br /> Thank you for your letter of May 27, 1993, in which you request that EPA consider <br /> whether the forthcoming expansion and operation of the IRM at DDRW-Tracy would be <br /> sufficient to meet the requirements of CERCLA §120(e)(2). This section states that <br /> "substantial continuous physical onsite remedial action shall be commenced at each facility <br /> not later than 15 months after completion of the investigation and study." It is EPA's <br /> understanding that DDRW-Tracy wishes clarification on this matter prior to development and <br /> submission of the draft remedial design and remedial action (RD/RA) schedule for OU-1. <br /> [Note: The RD/RA schedule is due September 3, 1993, i.e., 21 days following finalization of <br /> the OU-1 ROD.] <br /> DDRW-Tracy may find it instructive to review the RD/RA schedule developed for OU-1 <br /> for the DDRW-Sharpe facility (attached) as an example for developing the RD/RA schedule for <br /> OU-1 at DDRW-Tracy. It is noteworthy that the schedule for OU-1 at DDRW-Sharpe <br /> demonstrates compliance with the CERCLA 120(e)(2) 15-month deadline and that the DDRW- <br /> Sharpe schedule was developed with an IRM pump-and-treat system in place and operating. <br /> EPA encourages DDRW-Tracy to develop an OU-1 RD/RA schedule which will provide <br /> for full-scale remedial action as expeditiously as practicable. We hope that this information <br /> will be helpful. Please contact me at (415) 744-2392, should you have any questions. <br /> Sincerely, <br /> Michael Work <br /> Federal Enforcement Section I (H-9-1) <br /> Office of Superfund <br /> Attachment <br /> cc: (See Attached List) <br /> Printed on Reepded Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.