My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OU-1 Remedial Design SOW Memorandum -2- 11 June 1993 <br /> DDRW, Tracy <br /> 6. Page A-23, Section 7.3.3.4; This section states that a minimum five (5) foot <br /> seal will consist of tamped bentonite pellets or bentonite slurry. It is <br /> unclear how this will be accomplished, but depending on the method used, <br /> tamping could cause damage to the transition seal or the well casing. The top <br /> of the transition seal must be tagged with a weighted tape during placement to <br /> assure that the material is not bridging and that the targeted thickness has <br /> been achieved. In addition, placement of the cement grout seal subsequent to <br /> allowing adequate hydration of the bentonite pellets, will consolidate the <br /> transition seal . Therefore, tamping is unnecessary. <br /> 7. Page A-24, Section 7.3.4.4; This section states that soil samples collected <br /> for geotechnical analysis shall be stored in labeled, air-tight plastic or <br /> glass containers by the AE until such time as they are needed for testing or <br /> the contract is complete. Soil samples for geotechnical analysis should be <br /> collected in 6 inch brass or stainless steel tubes inserted into the split- <br /> spoon sampler. The tubes can then be sealed with plastic end caps, taped, <br /> labeled and stored without disturbing the soil sample. <br /> Statement of Work - Well Installation in Support of Remedial Design <br /> 8. Page 15; The zip code for the RWQCB is incorrect. The correct address is on <br /> this cover letter and memorandum headers. All submittals should be addressed <br /> to my attention as Remedial Project Manager (RPM) for the Board. <br /> 9. Page 31, Section 7.3.3.2.2; See comment No. 5 above. <br /> 10. Page 32, Section 7.3.3.4; See comment No. 6 above. <br /> 11 . Page 33, Section 7.3.4.4; See comment No. 7 above. <br /> JDT:jt <br />
The URL can be used to link to this page
Your browser does not support the video tag.