My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t) STATE OF CALIFORNIA-Environmental Protecogency • PETE WILSON, Governor <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road, Suite A e <br /> Sacramento, CA 95827-3098 <br /> PHONE: (916) 255-3000 <br /> DOD FAX: (916)255-3052 M <br /> 26 April 1993 APR 2 9 1333 <br /> ENVIRONIIE dIW1 HFALTH <br /> Mr. Abel Haines ItIMITp (�V� <br /> Environmental Protection Office <br /> Bldg. S-108, Sharpe Site <br /> Defense Distribution Region West <br /> P. 0. Box 960001 <br /> Stockton, CA 95296-0710 <br /> SITE WIDE REMEDIAL INVESTIGATION (RI) WORK PLAN, DEFENSE DISTRIBUTION REGION WEST <br /> (DDRW) , TRACY, SAN JOAQUIN COUNTY <br /> On 23 March 1993, we met with representatives of DDRW, Tracy, the Corps of Engineers <br /> (CoE) and Montgomery Watson to discuss the Site-Wide Remedial Investigation (RI) <br /> Work Plan. The meeting was held to discuss the current plans for the site-wide RI <br /> now being conducted by Montgomery Watson. During the course of the meeting, it <br /> became apparent that Montgomery Watson was not aware of our concerns on the <br /> proposals for the site-wide RI which had been previously discussed in detail with <br /> DDRW, Tracy, the CoE and the previous contractor, Woodward Clyde. <br /> By letter dated 9 April 1992, we transmitted our concerns and recommendations for <br /> the site-wide RI. It is unclear if the work that was negotiated in April 1992 has <br /> been incorporated into the RI program scheduled to begin in Spring 1993. During the <br /> meeting and in the weeks since that time, it has become evident that some of our <br /> recommendations to avoid unnecessary work, cannot be implemented because the <br /> contracts are already in-place. <br /> Our reviews of Work Plans and other documents have been provided, not only to assure <br /> that water quality concerns are adequately addressed, but to provide recommendations <br /> for optimization of the RI and cleanup in the most cost effective manner. It now <br /> appears that the contracts may be driving the technical decisions rather than the <br /> technical decisions driving the contracts. We have enclosed a memorandum which <br /> discusses our concerns in more detail . <br /> In the future, we plan to send copies of all of our correspondence to the <br /> contractor, Montgomery Watson, in addition to the CoE, to assure that our concerns <br /> are addressed. In this way, we hope that miscommunications can be avoided. <br /> If you have any questions, please call Mr. James Taylor at (916)255-3065. <br /> � <br /> NTONIA K. J. VORSTER <br /> Senior WRC Engineer <br /> CKW:cw <br /> Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.