My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 March Meeting -2- 26 April 1993 <br /> DDRW, Tracy <br /> site basis to determine what work should be done and at that time, all of the <br /> Project Managers agreed to the necessary investigation, including use of the <br /> HydropunchT" at the WMUs. We still do not know if what was agreed upon with <br /> Woodward Clyde in the April 1992 Meeting is the same as the work now scheduled to be <br /> performed by Montgomery Watson in 1993. <br /> It appears that the CoE did not give Montgomery Watson our comments on the Draft <br /> Work-Plan and did not convey what was agreed to during the April 1992 meeting for <br /> the site-wide investigation. James and I have discussed this meeting and have <br /> concluded that all future correspondence should be carbon copied (cc) to Montgomery <br /> Watson, as well as to the CoE, in order to avoid miscommunication and to assure that <br /> our concerns are addressed. <br /> It was also apparent from the Meeting that the CoE was unwilling or unable to modify <br /> the contract from what was being proposed by Montgomery Watson in order to assure <br /> that the work that we had agreed to in 1992 would indeed be performed. It now <br /> appears that contracts may be driving technical decisions rather than technical <br /> decisions driving the contracts. <br /> Attachment: file copy only <br />
The URL can be used to link to this page
Your browser does not support the video tag.